Project: 820270 Playground Equipment Replacement<br />

Origination Year: 1998-99<br />

Planned Completion Year: Ongoing<br />

Department: Community Services<br />

Project Description / Scope / Purpose<br />

Project Information Sheet<br />

Type: Parks & Recreation<br />

Category: Infrastructure<br />

Project Manager: Scott Morton<br />

Fund: 610 Infrastructure Renov & Replace<br />

Sub-Fund: 100 General Fund Assets<br />

Project Coordinator: Scott Russell<br />

This project provides for the replacement <strong>of</strong> parks playground equipment and resilient surfacing on a 20-year cycle. Estimates are based on current costs for resilient surfacing and recently<br />

completed playground renovation projects at Raynor Park. Replacement priorities are determined by an extensive survey and review <strong>of</strong> all the park playgrounds. Staff updated this survey in<br />

summer 2008 to reflect funding and schedules to address actual conditions <strong>of</strong> the playground equipment and surface materials. Costs have increased due to rising costs <strong>of</strong> play equipment and<br />

surfacing and increased costs to provide equal play value while meeting current playground safety standards with replacement equipment.<br />

Project Evaluation and Analysis<br />

This project maintains existing service levels by replacing worn equipment. The alternative to replacement is to increase or decrease the replacement cycle to result in increased or decreased costs.<br />

These options would also result in either improved or diminished quality <strong>of</strong> playground equipment available for play. Extending replacement cycles greatly would likely result in safety concerns and<br />

potentially could require the removal <strong>of</strong> some equipment before its planned replacement.<br />

Fiscal Impact<br />

Funding for this project is from Park Dedication fees. Project costs include:<br />

FY 2009/10 - De Anza Playground resilient surfacing and Encinal Park tot lot; FY 2010/11 - Serra Tot Lot, Boat and Swing Area and Water Feature Area, Ponderosa Tot Area and Wood Structure<br />

(Baylands Park is being scheduled for renovation and has its own project); FY 2011/12 - Las Palmas; FY 2012/13 Greenwood; FY 2013/14 - Orchard Gardens; FY 2014/15 - Fair Oaks; FY<br />

2015/16 - Braly Main Play Area & Tot Lot; FY 2016/17- Serra Play Area; FY 2017/18- Lakewood; FY 2018/19 - Washington; FY 2019/20 and FY 2020/21 Cupertino Jr High; FY 2021/22 Victory<br />

Village; FY 2022/23 Ortega; FY 2023/24 Columbia Tot Lot & Play Area; FY 2024/25 Encinal Play Area; FY 2025/26 Cannery; FY 2026/27 Fairwood; FY 2027/28 Raynor; FY 2028/29 Encinal<br />

Tot Lot.<br />

Project Financial Summary<br />

Financial Data Prior<br />

Actual<br />

Project Costs<br />

Revenues<br />

Total<br />

Transfers-In<br />

Total<br />

Operating Costs<br />

Current 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 Y11-Y20<br />

2009-10<br />

Total<br />

Project<br />

Life Total<br />

981,982 221,285 409,100 339,660 71,788 154,406 145,712 226,889 61,939 207,912 199,182 35,853 2,462,143 5,517,851<br />

158,052 0 0 0 0 0 0 0 0 0 0 0<br />

0 158,052<br />

Park Dedication - Subdivisions 409,100 339,660 71,788 154,406 145,712 226,889 61,939 207,912 199,182 35,853 2,462,143<br />

34,462 221,285 409,100 339,660 71,788 154,406 145,712 226,889 61,939 207,912 199,182 35,853 2,462,143 4,570,331<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

Playground Equipment Replacement 820270