Project Information Sheet<br />

Project: 827080 Murphy/Evelyn Avenues Sewer Infrastructure Improvements<br />

Origination Year: 2009-10<br />

Planned Completion Year: 2010-11<br />

Department: Public Works<br />

Project Description / Scope / Purpose<br />

Type: Downtown<br />

Category: Capital<br />

Project Manager: Hira Raina<br />

Fund: 465 Wastewater Management Fund<br />

Sub-Fund: 300 Wastewater Infrastructure Subfund<br />

Project Coordinator: Jim Craig<br />

This project provides funding to replace 1,260 linear feet (615 linear feet on Murphy, 645 linear feet on Evelyn Avenue) <strong>of</strong> 8" and 14" (respectively) diameter sanitary sewer mains, 51 laterals, and<br />

to rehabilitate six manholes. This line has been in use for approximately fifty years and it requires monthly maintenance and cleanout due to the amount <strong>of</strong> grease from restaurants, bars and<br />

residential buildings. The work includes rehabilitation <strong>of</strong> the storm drain lines, including meeting new C3 storm drain requirements for a water filtration system. Design is being done along with<br />

new streetscape design for Murphy, Washington and Evelyn Avenues (CIP #826810), and construction will be staged to provide a minimum <strong>of</strong> disruption to local businesses and traffic in the<br />

Downtown area. Contract documents will also provide for a soils management plan to mitigate impacts <strong>of</strong> contaminated soils if encountered in the sewer reconstruction. Construction is anticipated<br />

to be completed in the summer <strong>of</strong> 2009 to meet the schedule requirements <strong>of</strong> two federally funded grants from MTC and VTA, which are associated with the Murphy Avenue streetscape project.<br />

Project Evaluation and Analysis<br />

The project will preserve the <strong>City</strong>'s investment in the infrastructure and prepare the area for redevelopment. Current infrastructure will be unable to absorb additional demands caused by the<br />

Downtown redevelopment.<br />

Fiscal Impact<br />

This project will be funded by the Wastewater Management Fund.<br />

Project Financial Summary<br />

Financial Data Prior<br />

Actual<br />

Project Costs<br />

Revenues<br />

Total<br />

Transfers-In<br />

Total<br />

Operating Costs<br />

Current 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 Y11-Y20<br />

2009-10<br />

Total<br />

Project<br />

Life Total<br />

48,806 1,151,194 0 0 0 0 0 0 0 0 0 0<br />

0 1,200,000<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

Murphy/Evelyn Avenues Sewer Infrastructure Improvements 827080