Project: 900252 Mountain View/Hetch-Hetchy Intertie<br />

Origination Year: 2005-06<br />

Planned Completion Year: 2010-11<br />

Department: Public Works<br />

Project Description / Scope / Purpose<br />

Project Information Sheet<br />

Type: Water<br />

Category: Infrastructure<br />

Project Manager: Hira Raina<br />

Fund: 460 Water Supply and Distribution Fund<br />

Sub-Fund: 300 Water Infrastructure Subfund<br />

Project Coordinator: Jim Craig<br />

This project would provide Sunnyvale's share for a feasibility study and subsequent design and construction <strong>of</strong> an intertie around an isolation valve in the Hetch Hetchy system. The <strong>City</strong> <strong>of</strong><br />

Mountain View initiated contact with Sunnyvale for this venture. Mountain View is eligible for grant funding and their grant application is pending approval. Other existing interties with the <strong>City</strong><br />

<strong>of</strong> Mountain View will also be studied.<br />

Water is delivered to the cities <strong>of</strong> Mountain View and Sunnyvale through the Hetch Hetchy pipeline. An intertie, as an adjunct to existing inter ties in the Mountain View and Sunnyvale water<br />

systems, would provide a means for the two cities to receive water supply during times when the Hetch-Hetchy system is down locally. If a section <strong>of</strong> the supply line is down, the other city could<br />

receive water through its counterpart. Sunnyvale could receive water from the north through Mountain View, and Mountain View would receive water from the south through Sunnyvale. The<br />

intertie, unlike existing ones, would be in the northern part <strong>of</strong> the <strong>City</strong> near the pipelines, and sized to provide larger quantities <strong>of</strong> water to the two systems than is now possible.<br />

The feasibility study, is estimated to cost $100,000. Mountain View would pay for 25%, Sunnyvale's share would be 25%, and the rest would be paid with Prop. 50 grant money. Construction <strong>of</strong><br />

the intertie, if the grant is awarded, would follow the study. Estimated project construction cost is $1 million, with 50% <strong>of</strong> the cost borne by Sunnyvale and Mountain View (25% each). The other<br />

50% would be paid by the grant.<br />

Project Evaluation and Analysis<br />

This project would maintain water supply to the Sunnyvale and Mountain View areas in case <strong>of</strong> an emergency resulting in the shutdown <strong>of</strong> the Hetch-Hetchy line on one side <strong>of</strong> the San Francisco<br />

gate valve, or the other, such as due to an earthquake or some other localized problem. If the entire system is shut down, then this intertie can still be effective in moving water between our systems,<br />

as long as there is sufficient supply from some other source, such as the Santa Clara Valley Water District, and groundwater wells.<br />

Fiscal Impact<br />

A feasibility study will determine the specific improvements needed to make the intertie. Mountain View applied for Prop 50 grant funding on behalf <strong>of</strong> both cities. The application is strengthened<br />

by making it a combined project <strong>of</strong> two cities. The project is revenue dependent and will not move forward without Prop. 50 and Mountain View contributions.<br />

Project Financial Summary<br />

Unfunded Project<br />

Financial Data Prior<br />

Actual<br />

Project Costs<br />

Revenues<br />

Total<br />

Transfers-In<br />

Total<br />

Operating Costs<br />

Current 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 Y11-Y20<br />

2009-10<br />

Total<br />

Project<br />

Life Total<br />

0 0 250,000 0 0 0 0 0 0 0 0 0<br />

0 250,000<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

Mountain View/Hetch-Hetchy Intertie 900252

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!