Project: 827150 Community Center Gas Line Replacement<br />

Origination Year: 2007-08<br />

Planned Completion Year: Ongoing<br />

Department: Community Services<br />

Project Description / Scope / Purpose<br />

Project Information Sheet<br />

Type: Parks & Recreation<br />

Category: Infrastructure<br />

Project Manager: Bob Van Heusen<br />

Fund: 610 Infrastructure Renov & Replace<br />

Sub-Fund: 100 General Fund Assets<br />

Project Coordinator: Bob Van Heusen<br />

This project provides for the replacement <strong>of</strong> the gas line at the Community Center Complex. In July 2002, Facilities Management discovered a leak in the gas line that serves the Community<br />

Center. While effecting repairs, it was determined by <strong>City</strong> inspectors that the line does not meet current <strong>City</strong> code. Nearly 2,000 feet <strong>of</strong> PVC gas line was installed by the <strong>City</strong> in the late 1970's and<br />

runs to all four buildings in the Center Complex and feeds boilers, heating, ventilation, and air conditioning (HVAC) units, and pottery kilns. PVC has now been determined to pose a hazard<br />

because <strong>of</strong> its brittleness and glued pipe joints. In fact, a gas leak that was discovered proved to be a failure <strong>of</strong> the glued joints at a pipe junction. To ensure safety for building users, Facilities<br />

Management will replace all defective PVC with polypropylene with fused joints as per current code. While the gas line was exposed, and before repairs were effected, pressure tests were<br />

performed to ensure that there were no further leaks in the system at that time. The design phase will be completed in FY 2008/09 and construction will begin in FY 2009/10.<br />

Project Evaluation and Analysis<br />

This project was originally proposed in FY 2002/03 (project #824170). However, after evaluation the gas line project scope was changed and a new project was created to replace the old project.<br />

The gas line does not meet code and must be brought up to code. Replacement <strong>of</strong> the gas line may have a temporary, minor impact to some programs held in the Creative Arts Center, Indoor Sports<br />

Center, and the Recreation Center Building. Scheduling <strong>of</strong> work shall take into account the programs scheduled in these facilities to minimize interruptions.<br />

Fiscal Impact<br />

The total costs for this project are estimated to be approximately $360,000. Costs are based on previous bids. Fund are available from Park Dedication Funds. There are no additional operating<br />

costs associated with this project.<br />

Project Financial Summary<br />

Financial Data Prior<br />

Actual<br />

Project Costs<br />

Revenues<br />

Total<br />

Transfers-In<br />

Total<br />

Operating Costs<br />

Current 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 Y11-Y20<br />

2009-10<br />

Total<br />

Project<br />

Life Total<br />

9,920 350,264 0 0 0 0 0 0 0 0 0 0<br />

0 360,184<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

9,920 350,264 0 0 0 0 0 0 0 0 0 0<br />

0 360,184<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

Community Center Gas Line Replacement 827150