Project: 825361 Replacement/Rehabilitation <strong>of</strong> Storm Drain Pipes<br />

Origination Year: 2005-06<br />

Planned Completion Year: Ongoing<br />

Department: Public Works<br />

Project Description / Scope / Purpose<br />

Project Information Sheet<br />

Type: Wastewater<br />

Category: Infrastructure<br />

Project Manager: Hira Raina<br />

Fund: 465 Wastewater Management Fund<br />

Sub-Fund: 300 Wastewater Infrastructure Subfund<br />

Project Coordinator: Jim Craig<br />

This project provides ongoing funding for replacement / rehabilitation <strong>of</strong> the <strong>City</strong>'s 327 miles <strong>of</strong> storm drain pipes. The storm system infrastructure is, on average, 50 years old. This project will<br />

replace or rehabilitate storm drain pipes, depending on condition, at a rate <strong>of</strong> 800 lf/yr at $280/foot, beginning in FY 2016/17, after results from the first year <strong>of</strong> video inspections <strong>of</strong> the storm<br />

system are available. Storm systems are not generally subjected to the same conditions as sewer systems, and can be expected to last longer.<br />

This project will be completed in coordination with project 825371, "Video Inspection and Evaluation <strong>of</strong> Storm Drain System". Following video inspection, the project may be revised.<br />

Project Evaluation and Analysis<br />

The other alternatives to the project are to either not fund it or to delay funding to later years. If funding is not provided or delayed for too long, however, breaks in the system due to aging might<br />

develop that could cause flooding. Emergency repairs would then be necessary, which are usually more expensive than scheduled replacements.<br />

Fiscal Impact<br />

This project is funded from the Wastewater Management Fund. There is no impact on the operating budget.<br />

Project Financial Summary<br />

Financial Data Prior<br />

Actual<br />

Project Costs<br />

Revenues<br />

Total<br />

Transfers-In<br />

Total<br />

Operating Costs<br />

Current 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 Y11-Y20<br />

2009-10<br />

Total<br />

Project<br />

Life Total<br />

0 0 0 0 0 0 0 0 252,260 257,306 262,452 267,701 3,160,957 4,200,676<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

Replacement/Rehabilitation <strong>of</strong> Storm Drain Pipes 825361