102<br />

form <strong>of</strong> the all-weather road,<br />

b)<br />

accommodation and communication<br />

facilities, and construction power for the<br />

project is available.<br />

Infrastructural facilities viz., roads, field<br />

hostel, some residential buildings,<br />

primary school, CISF quarters, Bank,<br />

Post <strong>of</strong>fice, Police Post and shopping<br />

complex have been constructed.<br />

The 33 KV line from Chamba and<br />

Bhagirathi Puram to Project site has been<br />

constructed. The 33 KV sub-station and<br />

11 KV line to Project site is in operation.<br />

Civil Works<br />

The Diversion Tunnel has been<br />

constructed and Bhagirathi River diverted<br />

in Dec.,2003. Construction <strong>of</strong> u/s C<strong>of</strong>fer<br />

Dam is in progress and has been raised<br />

to EL 550 m.<br />

The main Civil Works package has been<br />

awarded to M/s PCL Intertech-Lenhydro<br />

Consortium JV in August’02. The work is<br />

in progress.<br />

The Open Excavation for Dam, Spillways<br />

and Surface <strong>Power</strong> House is in progress.<br />

Out <strong>of</strong> total Open Excavation <strong>of</strong> 49.86<br />

Lac. cum., a quantity <strong>of</strong> 26 Lac. Cum.<br />

has been executed for Dam, Spillways<br />

and <strong>Power</strong> Intakes.<br />

c) HM Works<br />

Hydro-Mechanical Packages for Diversion<br />

Tunnel Gate has been awarded to<br />

M/s TSPL. Fixing <strong>of</strong> second stage<br />

Embedments for Diversion Tunnel Gate<br />

has been completed.<br />

Award for other packages <strong>of</strong> Hydro-<br />

Mechanical Equipment is under process.<br />

d) E&M Works<br />

The Electro-Mechanical Equipment<br />

package has been , awarded to M/s<br />

BHEL in Feb.’03 & work is in progress.<br />

Model testing <strong>of</strong> turbine is in progress.<br />

COMMISSIONING SCHEDULE<br />

The Project is scheduled for commissioning in<br />

the year 2006-07. EXPENDITURE Total<br />

expenditure incurred on Koteshwar HEP (400<br />

MW) upto March.2004 is Rs.221.05 cr.<br />

(Provisional). TEHRI PUMP STORAGE PLANT<br />

(PSP) 1000 MW The Pump Storage Plant<br />

envisages 4 reversible units <strong>of</strong> 250 MW each.<br />

The main feature <strong>of</strong> the Project is the large<br />

variation <strong>of</strong> about 90 m between the maximum<br />

and minimum head, under which the reversible<br />

units shall operate. Certain essential works <strong>of</strong><br />

PSP were taken up alongwith the execution <strong>of</strong><br />

Stage-l works. The HRT & Intakes for Head Race<br />

Tunnels for PSP are being constructed alongwith<br />

the Stage-l works. The Transformer Hall<br />

constructed in Stage-l would also serve for PSP.<br />

Thus, major Civil Works to be taken up in PSP<br />

involve only the Machine Hall, Tail Race Tunnels,<br />

Upstream & Downstream Surge Shafts and<br />

Penstocks. The updated Cost Estimate for Rs.<br />

1799.67 Cr. at March,02 Price Level prepared<br />

by THDC has been cleared by CEA. Pre - PIB<br />

meeting has already been held and the Proposal<br />

for PIB approval for implementation <strong>of</strong> Project is<br />

under process. COMMISSIONING SCHEDULE<br />

The Project is scheduled for commissioning in<br />

4 1 / 2 years after the investment approval.<br />

NEW PROJECTS<br />

Vishnu Gad Pipalkoti (340 MW)<br />

Govt. <strong>of</strong> Uttaranchal have entrusted the 340 MW<br />

Vishnu Gad Pipalkoti Project to THDC for<br />

implementation. MOEF has accorded site<br />

clearance for undertaking Survey & Investigation<br />

and for collection <strong>of</strong> environmental data for<br />

preparation <strong>of</strong> feasibility report, and necessary<br />

funds for the Survey & Investigation have been<br />

released by the <strong>Ministry</strong>.<br />

CONSULTANCY<br />

THDC and Engineers India Limited (EIL) have<br />

signed a Memorandum <strong>of</strong> Understanding (MOU)<br />

to Co-operate and Leverage their respective<br />

strengths and competencies for getting New<br />

Projects in the field <strong>of</strong> Hydro <strong>Power</strong> Development<br />

in India and abroad.