Hydel Channel are being carried out online<br />

without any closure. Sand grouting <strong>of</strong> lining is<br />

done regularly and under water repairs are done<br />

with the help <strong>of</strong> divers. This has not only helped<br />

in maintaining an uninterrupted supply <strong>of</strong> water<br />

to the partner States but has also helped in<br />

continuous operation <strong>of</strong> Ganguwal and Kotia<br />

<strong>Power</strong> Houses for the last 50 years.<br />

ENVIRONMENT MANAGEMENT PLAN<br />

Under the plantation programme, 39,609 trees<br />

and shrubs have been planted during the year<br />

2003-04. The programme for planned plantation<br />

on vacant land at project sites has been taken<br />

up and at Talwara it has already been started<br />

on a 50 acre plot.<br />

EMP for Beas Satluj Link Projects : Concerns<br />

have been expressed regarding the environmental<br />

impact <strong>of</strong> disposal <strong>of</strong> silt from Balancing Reservoir<br />

into Suketi Khad for onward transmission to river<br />

Beas. In order to carry out Environmental Impact<br />

Assessment for BSL Project, BBMB engaged<br />

the services <strong>of</strong> National Environmental Engineering<br />

Research Institute (NEERI) Nagpur. NEERI<br />

submitted its report recommending short-term and<br />

long-term measures. BBMB in its 176th meeting<br />

held on 12.11.2001 approved the implementation<br />

<strong>of</strong> short-term measures at an estimated cost <strong>of</strong><br />

Rs. 182.80 lacs and decided to explore most<br />

techno-economic option for long-term measures.<br />

CONSULTANCY SERVICES<br />

In an endeavour to synergise the exising potential<br />

<strong>of</strong> BBMB to boost the interests <strong>of</strong> its partner<br />

States, BBMB Consultancy Services were<br />

introduced.<br />

The following works have been executed/are under<br />

execution by the Consultancy Services:-<br />

A view <strong>of</strong> Bhakra Dam<br />

Consultancy on procurement <strong>of</strong> Switchgear<br />

equipments by HVPNL.<br />

Preparation <strong>of</strong> Feasibility and Detailed<br />

Project Reports for own Projects viz. Baggi<br />

PH (2×20 MW) and small Hydro Projects on<br />

Bhakra Main Line Canal (around 19.18 MW).<br />

Preparation <strong>of</strong> Hydro <strong>Power</strong> Studies (inhouse<br />

and for other SEBs viz. TNEB, MPSEB).<br />

Thermovision scanning, Hot Line<br />

maintenance and recommendation for<br />

upgradation <strong>of</strong> 220 KV Ring Main <strong>of</strong> DVB.<br />

Execution <strong>of</strong> work for Delhi Metro Rail<br />

Corporation for providing adequate clearance<br />

at Delhi Metro Rail Crossing.<br />

Providing ISO 9001-200 and 14001-1996 (or<br />

latest) Certification for Operation and<br />

Maintenance <strong>of</strong> Hydro <strong>Power</strong> Stations, Substations/Switchyards,<br />

Transmission Lines,<br />

Dams and Canals/Water Conductor System<br />

for the works under the jurisdiction <strong>of</strong> BBMB<br />

with the assistance <strong>of</strong> M/s RITES Ltd.<br />

Providing Hydrostatic Stretch Testing<br />

Services for hydrogen gas cylinders for<br />

PSEB.<br />

Turnkey execution <strong>of</strong> 66KV Substation in<br />

Sector-47, Chandigarh under U.T.<br />

administration on cost plus basis. The MOU<br />

has been signed with Chandigarh U.T.<br />

Administration and the execution <strong>of</strong> work is<br />

going as per schedule.<br />

The work <strong>of</strong> providing one additional bay at<br />

66 KV Sub Station Sector-1 and two<br />

additional bays at 66KV Substation, Indl.<br />

Area Phase-I, U.T. Chandigarh has been<br />

received on turnkey basis by BBMB from<br />

Chandigarh U.T. Administration.<br />