74<br />

7. Loktak Downstream HE Project (3x30<br />

MW), Manipur<br />

Loktak Downstream HE Project (90 MW) is<br />

located in Tamenglong District <strong>of</strong> Manipur. It is<br />

a run <strong>of</strong> the river scheme to utilize the discharges<br />

<strong>of</strong> the Loktak <strong>Power</strong> Station that is in operation<br />

since March,84. The Project will yield benefits<br />

<strong>of</strong> 7 hours <strong>of</strong> peaking power daily and an annual<br />

energy generation <strong>of</strong> 420.25 million units in a<br />

90% dependable year. It was sanctioned in<br />

December 1999 for a cost <strong>of</strong> Rs. 578.62 crores<br />

including IDC <strong>of</strong> Rs. 46.95 crores (at April 1999<br />

price level) and was scheduled to be completed<br />

by December 2008.<br />

8. Parbati HE Project, Stage-II (4x200 MW),<br />

H.P<br />

Parbati HE Project stage-II on river Parbti ( a<br />

tributary to Beas River) in Kullu district is a run<br />

<strong>of</strong> the river scheme. River diversion have been<br />

achieved in November,2003. Execution <strong>of</strong> adits<br />

for HRT, <strong>Power</strong> house completed.<br />

9. Sewa HE Project Stage-II (3x120 MW),<br />

H.P<br />

CCEA clearance was accorded by Govt. <strong>of</strong> India<br />

on 09.09.03. The Civil Works Lot-I - Diversion<br />

Tunnel, C<strong>of</strong>fer Dams, Concrete gravity Dam,<br />

Desilting Chambers, HRT & other associated<br />

works have been awarded on 9.9.2003.<br />

C. NEW SCHEMES<br />

S. Projects State Inst. Capacity<br />

No. (MW)<br />

1. Koel Karo Jharkhand 710<br />

2. Kishenganga J&K 330<br />

3. Chamera-III H.P. 231<br />

4. Parbati-III H.P. 520<br />

5. Uri–II J&K 240<br />

6. Chutak J&K 44<br />

7. Siang Middle A.P. 1000<br />

8. TLDP-IV W.B. 160<br />

9. Nimmo Bazgo J&K 45<br />

TOTAL 3280<br />

1. Koel Karo HE Project (710 MW),<br />

Jharkhand.<br />

The project was sanctioned in Nov. 91. However,<br />

due to local resistance regarding R&R issue,<br />

land acquisition and paucity <strong>of</strong> fund, the work<br />

on this project could not be taken up. CCEA<br />

note for the third revised cost estimate was<br />

returned by CCEA for getting final approval from<br />

MOEF and consent <strong>of</strong> beneficiary states for<br />

purchase <strong>of</strong> power. CAT plan was approved by<br />

MOEF in Nov. 2000 & Govt. <strong>of</strong> Jharkhand had<br />

submitted the revised R&R plan.<br />

The issues to be resolved with State Govt before<br />

starting the projects are:<br />

Fresh survey <strong>of</strong> project affected people<br />

through Land Acquisition & Rehabilitation<br />

Directorate.<br />

Signing <strong>of</strong> PPA with Govt. <strong>of</strong> Jharkhand.<br />

2. Kishenganga HE Project (330 MW), J&K<br />

CEA has issued Techno-Commercial Appraisal vide<br />

letter dated 06.08.2003 at Jan 2003 price level.<br />

3. Chamera (Stage-III) HE Project (231 MW),<br />

Himachal Pradesh<br />

Feasibility report was submitted by NHPC and<br />

Commercial Viability has been established by<br />

CEA vide letter dated 7.9.2001. MOEF has<br />

accorded site clearance stage –I & II in October<br />

2001 & December 2001 respectively. DPR<br />

submitted to CEA on 19.6.2003 for Techno-<br />

Economic Clearance. CEA has issued Techno<br />

Economic clearance on 10.10.2003. Development<br />

<strong>of</strong> infrastructure is in progress.<br />

4. Parbati –III HE Project (520 MW), H.P.<br />

Feasibility report has been submitted by NHPC<br />

and Commercial Viability has been established<br />

by CEA vide letter dated 17.9.2001. MOEF has<br />

accorded site clearance stage-I & II in December<br />

2000 & March 2002 respectively. DPR submitted<br />

to CEA on 08.08.2003 and CEA has accorded<br />

TEC on 12.11.2003. Development <strong>of</strong> infrastructure<br />

is in progress.<br />

5. Uri HE Project Stage – II (240 MW), J&K<br />

Feasibility report has been submitted by NHPC<br />

and Commercial Viability has been established<br />

by CEA vide letter dated 2.8.2001. MOEF has<br />

accorded site clearance stage – I & II in August<br />

2001. DPR was submitted to MOP vide our letter<br />

dated 29.8.2003 for accord <strong>of</strong> Techno-Economic<br />

Appraisal. TEA meeting was held on 25.11.2003<br />

and TEA letter issued vide letter dated 11.02.04.<br />

6. Chutak HE Project (44MW), J&K<br />

Feasibility Report has been submitted by NHPC<br />

and Commercial Viability has been established<br />

by CEA vide letter dated 15.9.2003. Site<br />

Clearance Stage – I & II has been accorded by<br />

MOEF vide letter dated 1.11.2001 & 9.10.2003<br />

respectively. Stage- II Cost Estimate for<br />

preparation <strong>of</strong> DPR and taking up infrastructure<br />

development has been recommended by CEA to