92<br />

iv)<br />

NEEPCO have been signed. PIB note has<br />

been circulated and the major works <strong>of</strong> the<br />

project are proposed to be started after<br />

obtaining investment approval.<br />

Tipaimukh H.E. Project (1500 MW)-<br />

Manipur : This Project was initially<br />

investigated by CWC and then by<br />

Brahmaputra Board. It has been handed over<br />

to NEEPCO for execution. MOU with the<br />

Govt. <strong>of</strong> Manipur has been signed. The<br />

revised DPR prepared by NEEPCO at a cost<br />

<strong>of</strong> Rs.5163.86Crs.was Techno -<br />

v)<br />

Economically cleared by CEA on 02.07.03.<br />

Pre – PIB meeting held on 13.08.03. Pre –<br />

qualifying <strong>of</strong> Bidders through International<br />

competitive Bidding (ICB) is under finalisation.<br />

Based on the decision arrived at during the<br />

Pre- PIB meeting and subsequent meetings<br />

held in <strong>Ministry</strong> <strong>of</strong> <strong>Power</strong>, an estimate for<br />

Stage – II activities for infrastructure<br />

development at a cost <strong>of</strong> Rs.157.00Crs. has<br />

been submitted to CEA on 22.12.03.Various<br />

formalities to obtain remaining statutory<br />

clearances are under way.<br />

TUIVAI H.E. PROJECT (210 MW) -<br />

MIZORAM:<br />

The proposed Tuivai H.E. Project is located<br />

in Aizwal district <strong>of</strong> Mizoram. The project<br />

comprises <strong>of</strong> construction <strong>of</strong> a 155 M.high<br />

Rock-fill Dam across the Tuivai river. The<br />

impounded water is proposed to be taken<br />

by one 4.95 km. Long HRT <strong>of</strong> 6 M. dia. to<br />

a surface <strong>Power</strong> House located in the right<br />

bank <strong>of</strong> the river with installation <strong>of</strong> 3 (three)<br />

units <strong>of</strong> 70 MW each. The project was<br />

initially investigated by CWC. All statutory<br />

clearances, including Forest and<br />

Environmental clearance, from MOEF & GOI<br />

have been received. TEC for the project has<br />

also been accorded by CEA on 19/02/99.<br />

Pre- construction activities like development<br />

<strong>of</strong> infrastructural facilities and detailed survey<br />

and investigation works are in progress.<br />

Telecommunication system on the project<br />

site has been established. The 2nd stage<br />

proposal under the 3 stage clearance<br />

procedure for the Hydro Project is under<br />

examination. The Project is envisaged to<br />

be completed within a period <strong>of</strong> 66 months<br />

from the date <strong>of</strong> investment approval.<br />

NEW SCHEMES FOR EXECUTION:<br />

The following new schemes have been identified<br />

for execution as Central Sector Projects by<br />

NEEPCO:<br />

1. LOWER KOPILI H.E. PROJECT (150 MW)<br />

- ASSAM : The proposed Lower Kopili H.E.<br />

Project is located in N.C. Hills district <strong>of</strong><br />

Assam. The proposal comprises <strong>of</strong><br />

construction <strong>of</strong> a 71.35 M. high concrete<br />

gravity Dam across the Kopili river in the<br />

down stream <strong>of</strong> the Kopili <strong>Power</strong> station.<br />

The impounded water is proposed to be lead<br />

through a 6.8 M dia. (Horse shoe) and<br />

3.56Km long Head Race Tunnel to a semiunder<br />

ground <strong>Power</strong> House with installation<br />

<strong>of</strong> 3 (three) units <strong>of</strong> 50 MW each. Presently<br />

Hydro-meteorological investigation <strong>of</strong> the<br />

project is being continued.<br />

i) Feasibility Report submitted to the CEA<br />

during the month <strong>of</strong> Oct’2002. Based on<br />

this, CEA accorded commercial viability <strong>of</strong><br />

the project in Feb’03.<br />

ii) Notification under Section 18A <strong>of</strong> the<br />

Electricity (Supply) act 1948 has been<br />

obtained on 18/10/2002 from MOP. The<br />

MOU with the Govt. <strong>of</strong> Assam for execution<br />

<strong>of</strong> the project and other statutory clearances<br />

required for granting TEC could not be<br />

obtained yet. Estimate for 2nd Stage activities<br />

has been cleared by CEA on 30.09.03 for<br />

an amount <strong>of</strong> Rs.15.11Crs.<br />

2. RANGANADI H.E. PROJECT -STAGE-II<br />

(130 MW) - ARUNACHAL PRADESH : This<br />

Project is located 10KM upstream <strong>of</strong> the<br />

present Ranganadi Diversion Dam. The<br />

Project envisages construction <strong>of</strong> a 134M<br />

high concrete Dam with installed capacity<br />

<strong>of</strong> 130MW. The commercial viability <strong>of</strong> the<br />

project has been established based on<br />

feasibility report submitted by NEEPCO in<br />

Oct’ 02. 2nd Stage estimate for infrastructure<br />

development cleared by CEA on 11.02.03<br />

for an estimated cost <strong>of</strong> Rs.15.37Crs. and<br />

NEEPCO has submitted the proposal to<br />

<strong>Ministry</strong> <strong>of</strong> <strong>Power</strong> for necessary approval<br />

and meeting held on 03.09.03.Memorendum<br />

for approval <strong>of</strong> Stage – II activities submitted<br />

to <strong>Ministry</strong> <strong>of</strong> <strong>Power</strong>, sanction <strong>of</strong> which is<br />

awaited. Pre- construction activities and<br />

infrastructure development under the 2nd stage clearance are continued.<br />

3. DIKRONG H .E. PROJECT (2 X 55 MW =<br />

110 MW) , ARUNACHAL PRADESH:<br />

This is a run <strong>of</strong> the river scheme which<br />

envisages utilisation <strong>of</strong> discharge <strong>of</strong> Dikrong<br />

River together with additional tail water<br />

discharge <strong>of</strong> 60 Cumecs from Hoz <strong>Power</strong><br />

House <strong>of</strong> RHEP Stage – I. The Project<br />

comprises <strong>of</strong> a Dam on river Dikrong at<br />

6Km down stream <strong>of</strong> Hoz <strong>Power</strong> House.