390 MW Dulhasti Project (J&K) - Adit Tunnel<br />
6. Bursar HE Project (1020 MW), J&K<br />
Commercial viability has been ascertained by CEA.<br />
Taking into account benefit <strong>of</strong> downstream NHPC<br />
projects (1571.23 MU) by which Ist year tariff will<br />
come down to Rs.2.93/unit. CPIB meeting for<br />
sanction <strong>of</strong> Stage-II estimate is to be fixed. Survey<br />
& Investigation works suffering on account <strong>of</strong><br />
adverse law & order situation. The scheme is<br />
under review alongwith Pakal Dul Project.<br />
7. Shivasamudram HE Project (270 MW),<br />
Karnataka<br />
CEA has accorded commercial viability to the<br />
feasibility report formulated by NHPC. Stage-II<br />
estimate is held up due to interstate dispute.<br />
No work is under progress.<br />
8. Bav (Stage-II) HE Project (20 MW),<br />
Maharashtra<br />
Feasibility Report for 50 MW was submitted to<br />
CEA for accord <strong>of</strong> commercial viability, which was<br />
also declared commercially viable on 23.05.2003.<br />
NHPC submitted revised FR for 20 MW on<br />
12.01.04. CEA vide letter dated 23.01.04 has<br />
ascertained commercial viability <strong>of</strong> the project.<br />
9. Bav Stage-I HE Project (18 MW),<br />
Maharashtra<br />
On account <strong>of</strong> large submergence and large<br />
number <strong>of</strong> families affected, MOEF in a meeting<br />
held on 21st Nov. 2001 advised that rather than<br />
taking up Bav-I & II Projects simultaneously;<br />
NHPC should take up the projects one after the<br />
other. It was agreed to proceed with Bav-II first.<br />
10. Devade HE Project (6 MW), Maharashtra<br />
Stage-I estimate to take up survey and<br />
investigation has been recommended by CEA.<br />
Survey and investigation works for preparation <strong>of</strong><br />
feasibility report <strong>of</strong> the project is in progress.<br />
11. Dibang HE Project (3000 MW), A. P.<br />
DPR under Preparation by Brahmputra Board &