30<br />

having an aggregate capacity <strong>of</strong> 10318 MW were identified to be undertaken under Phase-II programme<br />

till the end <strong>of</strong> Xth Plan to accrue a benefit <strong>of</strong> 3684.91 MW.<br />

c) National Perspective Plan:<br />

National Perspective Plan was formulated by CEA in the year 2000 including R&M proposals under<br />

Phase-II alongwith the left out schemes <strong>of</strong> National Committee (Phase-I) under implementation/ yet<br />

to be implemented. This Plan indicated the benefit <strong>of</strong> about 7755 MW during the IXth, Xth and<br />

XIth Plan through R&M <strong>of</strong> existing 117 schemes with an aggregate installed capacity <strong>of</strong> 19370 MW<br />

at an estimated cost <strong>of</strong> Rs.4654 crores.<br />

d) Revised Xth & XIth Plan Programme:<br />

The schemes identified by CEA under National Perspective Plan and not completed till the beginning<br />

<strong>of</strong> the Xth Plan were reviewed in totality in consultation with the utilities and a total <strong>of</strong> 74 schemes<br />

(11 schemes under the Central Sector and 63 schemes under State Sector) having a total installed<br />

capacity <strong>of</strong> 8082.45 MW to accrue a benefit <strong>of</strong> 2446.87 MW at an estimated cost <strong>of</strong> Rs.2712.237<br />

Crores were identified for renovation, modernization and uprating during the Xth Plan and presently<br />

the schemes are under various stages <strong>of</strong> implementation. Further 31 schemes (2 schemes under<br />

Central Sector and 29 schemes under State Sector) having a total installed capacity <strong>of</strong> 4681 MW to<br />

accrue a benefit <strong>of</strong> 4415.10 MW at an estimated cost <strong>of</strong> Rs.2168.61 Crores were identified for<br />

RM&U during the XIth Plan.<br />

e) Plan wise summary <strong>of</strong> hydro R&M Schemes :<br />

SL. Plan Period No. <strong>of</strong> Schems Installed Cost (Rs.in Crs.) Benefit<br />

Central State Total Capacity Actual Estimated (MW)<br />

1<br />

Completed<br />

VIIIth Plan 2 11 13 1282.00 127.37 429.00<br />

2. IXth Plan 8 12 20 4892.10 567.56 1338.03<br />

3 Xth Plan (till 31.3.04)<br />

Programme<br />

2 11 13 1278.80 458.28 385.00<br />

4 Xth Plan<br />

(Remaining period)<br />

9 52 61 6803.65 2247.65 2061.87<br />

5 XIth Plan 2 29 31 4681.00 2168.61 4415.10<br />

f) Achievement during the period 1-1-2003<br />

to 31-03-2003 <strong>of</strong> the year 2002-03 :<br />

The following 3 State Sector schemes to<br />

accrue a benefit <strong>of</strong> 94.30 MW having an<br />

installed capacity <strong>of</strong> 94.30 MW at an<br />

estimated cost <strong>of</strong> Rs.148.67 Crores have<br />

been completed during the period 01-01-2003<br />

to 31-03-2003 <strong>of</strong> the year 2002-03.<br />

Sl. No. Name <strong>of</strong> scheme (I.C. in MW),<br />

Agency<br />

1 Munirabad (2x9 + 1x10.3), VVNL<br />

2 Panniar (2x15), KSEB<br />

3 Umium St.I (4x9), MeSEB<br />

g) Programme for the year 2003-04 :<br />

As per the revised Xth Plan programme, the<br />

following 11 schemes (3 in Central Sector<br />

& 8 in State Sector) to accrue a benefit <strong>of</strong><br />

170.35 MW having an installed capacity <strong>of</strong><br />

2737.95 MW at an estimated cost <strong>of</strong><br />

Rs.199.865 Crores have been programmed<br />

for completion during the year 2003-04.<br />

Sl. No. Name <strong>of</strong> scheme (I.C. in MW),<br />

Agency<br />

1 Shanan Ph-A (4x15 + 1x50), PSEB