66<br />
8 Kahalgaon-II TPP,Ph-II, Bihar Coal 500<br />
9 Sipat-II TPP,Chattisgarh Coal 1000<br />
NEW PROJECTS<br />
1 Sipat-I TPP, Chattisgarh@ Coal 1980<br />
2 Barh TPP,Bihar Coal 1980<br />
3 North Karanpura TPP, Jharkhand Coal 1980<br />
4 Kawas-II CCPP,Gujarat LNG/ Natural Gas 1300<br />
5 Gandhar-II CCPP,Gujarat LNG/ Natural Gas 1300<br />
6 Loharinag Pala HEPP,Uttaranchal Hydro 600<br />
7 Tapoban Vishnugad HEPP,Uttaranchal Hydro 520<br />
8 Kayamkulam CCPP-II,Kerala LNG/ Natural Gas 1950<br />
9 LataTapovan HEPP, Uttaranchal # Hydro 108<br />
10 Nabinagar TPP, Bihar (Under JV) Coal 1000<br />
11 Bhilai CPP-II, Chattisgarh (Under JV) Coal 500<br />
12 Ennore TPP,Tamil Nadu (Under JV) Coal 1000<br />
* 1000 MW already commissioned<br />
Note : JV – Joint Venture<br />
# Thru NTPC Hydro Ltd. –a wholly owned subsidiary <strong>of</strong> NTPC<br />
@ The Investment approval for Sipat-I TPP has been accorded and the main plant contract for SG<br />
package and TG package have been awarded in April,2004<br />
A) ON-GOING PROJECTS — 8,010 MW<br />
8010 MW capacities for Talcher-II (Out <strong>of</strong><br />
totalcapacity <strong>of</strong> 2000 MW for Talcher-II, 1000<br />
MW has been already commissioned),<br />
Rihand-II, Ramagundam-III, Koldam HEPP,<br />
Vindhyachal-III, Kahalgaon-II, Sipat-II and<br />
Unchahar-III is already under construction:<br />
Talcher-II (4x500 MW), Orissa<br />
Commissioning Schedule : Unit-V (May’ 2005)<br />
Unit-VI (February<br />
‘2006)<br />
Present Status : Unit-III and IV are<br />
under Commercial<br />
operation. Erection<br />
work is in progress<br />
as per schedule for<br />
Unit-V & VI.<br />
Ramagundam-III (1x500 MW), Andhra<br />
Pradesh<br />
Commissioning Schedule : Unit-VII (August<br />
2005)<br />
Present Status : Civil construction<br />
and erection work<br />
is in progress as<br />
per schedule.<br />
Rihand-II (2x500 MW), Uttar Pradesh<br />
Commissioning Schedule : Unit-III (August<br />
2005)<br />
Unit-IV (May 2006)<br />
Present Status : Civil construction<br />
and erection work<br />
in both the units is<br />
in progress as per<br />
schedule.<br />
Koldam HEPP (4X200 MW), Himachal Pradesh<br />
Commissioning Schedule : Unit-I (November<br />
2008)<br />
Unit-II (January<br />
2009)<br />
Unit-III (March 2009)<br />
Unit-IV (April 2009)<br />
Present Status : - Main dam<br />
package has been<br />
awarded Dec.’03<br />
and excavation<br />
work has been<br />
taken up.<br />
- Price bids for<br />
<strong>Power</strong> House &<br />
penstock package<br />
opened on 31 st<br />
Mar’2004.Price bids<br />
for Electromechanical<br />
Pkg<br />
have been opened<br />
on 5 th April’2004.<br />
- NIT for desilting<br />
arrangement<br />
package has been<br />
issued on 31 st<br />
Mar’2004.