q CAPACITY ADDITION PROGRAMME FOR<br />

2002-2003 AND ACHIEVEMENT DURING<br />

2002-2003<br />

Programme<br />

38 power generating units with a total capacity<br />

<strong>of</strong> 4109.10 MW comprising <strong>of</strong> 607 MW hydro<br />

and 3502.10 MW thermal were programmed for<br />

commissioning during 2002-03. The sector-wise<br />

break-up is given as under :-<br />

Central State Private Total<br />

Sector Sector Sector<br />

Thermal 920.00 790.10 1792.00 3502.10<br />

Hydro 250.00 357.00 0.00 607.00<br />

Nuclear 0.00 0.00 0.00 0.00<br />

Total 1170.00 1147.10 1792.00 4109.10<br />

Achievement<br />

Central State Private<br />

(In MW)<br />

Total<br />

Sector Sector Sector<br />

Hydro 0.00 435.00 200.00 635.00<br />

Thermal 1210.00 665.10 348.00 2223.10<br />

Nuclear 0.00 0.00 0.00 0.00<br />

Total 1210.00 1100.10 548.00 2858.10*<br />

* Short fall in achievement was due to<br />

non-commissioning <strong>of</strong> Dabhol-II (1444 MW)<br />

project under private sector.<br />

q CAPACITY ADDITION PROGRAMME FOR<br />

2003-04 AND ACHIEVEMENT DURING 2003-04<br />

• Programme<br />

Central State Private<br />

(In MW)<br />

Total<br />

Sector Sector Sector<br />

Thermal 710.00 674.54 52.80 1437.34<br />

Hydro 3465.00 200.00 100.00 3765.00<br />

Nuclear 0.00 0.00 0.00 0.00<br />

Total 4175.00 874.54 152.80 5202.34<br />

Achievement<br />

(In MW)<br />

Central State Private Total<br />

Sector Sector Sector<br />

Hydro 2325.00 165.00 100.00 2590.00<br />

Thermal 710.00 651.62 0.00 1361.62<br />

Nuclear 0.00 0.00 0.00 0.00<br />

Total 3035.00 816.62 100.00 3951.62<br />

q CAPACITY ADDITION (LAST FIVE YEARS)<br />

In the last five years including 2003-04 (April<br />

2003-March, 2004), the following new capacities<br />

have been added:<br />

(In MW)<br />

Year Centre State* Total*<br />

1998-99 991.60 3250.40 4242.00<br />

1999-2000 1615.40 2892.10 4507.50<br />

2000-01 659.00 3116.66 3775.66<br />

2001-02 905.00 2210.20 3115.20<br />

2002-03 1210.00 1648.10 2858.10<br />

2003-04 3035.00 916.62 3951.62<br />

Total 8416.00 14034.08 22450.08<br />

*includes private sector projects<br />

q FINANCIAL OUTLAYS<br />

10th Plan 2002-03<br />

(in Crore)<br />

2003-04<br />

Allocation 143399 13483 14667.61<br />

(GBS 25000, (GBS 3300, (GBS 3500,<br />

IEBR 118399) IEBR 10183) IEBR 11167.61)<br />

Spent 8649.22 11136.41<br />

(GBS 1830.46, (GBS 1847.66<br />

IEBR 6818.76) IEBR 9288.75)