CWC with inputs <strong>of</strong> certain investigations results<br />

by NHPC. Recently CWC has changed Dam<br />

Axis. Tentative schedule for completion <strong>of</strong> DPR<br />

is June’04.<br />

12. Lakhwar Vyasi HE Project (420MW),<br />

Uttranchal.<br />

An MOU was signed on 1.11.2003 between<br />

NHPC and Government <strong>of</strong> Uttranchal. Collection<br />

<strong>of</strong> data/records for preparation <strong>of</strong> revised DPR is<br />

in progress.<br />

13. Kotlibhel HE Project (850 MW)<br />

Uttranchal Government has entrusted the<br />

Kotlibhel Project to NHPC and MOU was signed<br />

between NHPC and Uttranchal Government on<br />

22.9.03, which envisages cascade development<br />

<strong>of</strong> Kotlibhel Project. Stage-I estimate amounting<br />

to Rs.22.85 crorers for preparation <strong>of</strong> FR <strong>of</strong> the<br />

three stage <strong>of</strong> the project submitted to CEA on<br />

01.12.03. Based on reconnaissance survey and<br />

preliminary study, NHPC has proposed three<br />

stage development.<br />

A KOTLI BHEL STAGE-IA (At Mudeth): It is<br />

proposed to be constructed on river<br />

Bhagirathi, 2 kms upstream <strong>of</strong> Devprayag<br />

with an installed capacity <strong>of</strong> 300MW.<br />

B KOTLI BHEL SAGE-IB(At Pali) It is<br />

proposed to be constructed on river<br />

Alaknanda, 6 kms upstream <strong>of</strong> Devpryag<br />

with an installed capacity <strong>of</strong> 250 MW.<br />

C KOTLI BHEL SAGE-I I (Near Kaudiyala):<br />

It is proposed to be constructed on river<br />

Ganga, 20 Kms downstream <strong>of</strong> Devprayag<br />

with installed capacity <strong>of</strong> 300 MW.<br />

Site clearance (Stage-I) for Kotlibhel cascade<br />

scheme has been accorded by MOEF through<br />

their letter dated: 20.10.03. Survey &<br />

Investigation works are in progress.<br />

E JOINT VENTURE PROJECTS.<br />

1. Indira Sagar HE Project (8x125 MW),<br />

Madhya Pradesh<br />

The project is under execution by NHDC, a<br />

Joint Venture Company with equity<br />

participation <strong>of</strong> MOP/NHPC and GOMP<br />

incorporated in Aug. 2000 to take up<br />

execution <strong>of</strong> Indira Sagar HE Project (1000<br />

MW) and Omkareshwar Project (520 MW).<br />

The Government has accorded sanction for<br />

incorporation <strong>of</strong> NHDC and cost estimate<br />

for execution <strong>of</strong> Indira Sagar project in March,<br />

2002. The construction <strong>of</strong> all the project<br />

components are going as per approved<br />

2.<br />

schedule and the project is to be<br />

commissioned by May, 2005. However with<br />

the pace <strong>of</strong> the work, 4 Units <strong>of</strong> the project<br />

have already been commissioned by March<br />

2004 much ahead <strong>of</strong> schedule. The overall<br />

project is expected to be completed by<br />

December 2004.<br />

Omkareshwar HE Project (8x65 MW),<br />

Madhya Pradesh<br />

CCEA approval has been accorded on<br />

29.05.2003. Notification <strong>of</strong> award for the<br />

work <strong>of</strong> turnkey execution <strong>of</strong> (8x65 MW)<br />

520 MW Omkareshwar project has also been<br />

issued to M/s Jai Prakash – Voith Simens<br />

Consortium, New Delhi on 09.06.2003. The<br />

contractor has started mobilizing resources<br />

to take up construction <strong>of</strong> the project and<br />

many <strong>of</strong> construction activities have since<br />

been started in full swing. The infrastructure<br />

works are also in full swing.<br />

3 Purulia Pumped Storage Scheme (4x225<br />

MW), West Bengal.<br />

PIB meeting to consider formation <strong>of</strong> Joint<br />

Venture and investment decisions was held<br />

on 24.03.04. Minutes <strong>of</strong> meeting awaited.<br />

Tripartite <strong>Power</strong> Purchase Agreement with<br />

Govt. <strong>of</strong> W. B., WBPDC, for purchase <strong>of</strong><br />

input power and with Govt. <strong>of</strong> W.B., WBSEB<br />

for sale <strong>of</strong> generated power has been signed<br />

on 02.08.2003. CEA vide letter dated<br />

19.9.03, has expressed that point raised by<br />

it on Revised Cost Estimate have been<br />

resolved.<br />

F SMALL HYDROELECTRIC PROJECTS<br />

1. Kambang Small HE Project (6 MW), Ar.<br />

Pradesh<br />

The Project is under execution by NHPC<br />

on deposit basis from Arunachal State<br />

Government and construction works are<br />

going on in full swing. Commissioning <strong>of</strong><br />

the project is expected shortly.<br />

2 Sippi Small HE Project (4 MW), Ar.<br />

Pradesh<br />

The Project is under execution by NHPC<br />

on deposit basis from Arunachal State<br />

Government and construction works are<br />

going on in full swing. Commissioning <strong>of</strong><br />

the project is expected shortly.<br />

G DEVELOPMENT<br />

POWER<br />

OF GEOTHERMAL<br />

NHPC has been appointed as a Nodal<br />

77

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!