05.08.2013 Views

ORNL-5388 - the Molten Salt Energy Technologies Web Site

ORNL-5388 - the Molten Salt Energy Technologies Web Site

ORNL-5388 - the Molten Salt Energy Technologies Web Site

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

I-<br />

--<br />

I'<br />

c,<br />

u<br />

1 '<br />

b<br />

c<br />

IWO I I I I I I<br />

THE LWR WllH PWTONIUM RECYCLE<br />

WIMUM ANNUAL RECUIREMEM: Zi - LWR WITH PLUTONIUM<br />

RECYCLE<br />

yo. - 67 ' Id IT/*-<br />

IL - LWR ON THE THROWAWAY<br />

6-31<br />

2::<br />

1980 1m 2003 mo nno 2mo 20(0 2mo<br />

Fig. 6.2-13. The Effect on <strong>the</strong> Nuclear<br />

Contribution of Recycling Plutonium in LWRs<br />

(High-Cost U308 Supply).<br />

IWO<br />

I I I I I<br />

-Hf LWR WIIH PWIONIUM RECYCLE<br />

I I I I 1 I I<br />

IPBO IWO 1010 zom m fou) mo<br />

YUR<br />

Fig. 6.2-15. The Effect of U308 Supply<br />

on <strong>the</strong> Nuclear Contribution of <strong>the</strong> LWR with<br />

Plutonium Recycle (Case 2L).<br />

c*Sf 2L -THE LWI WITH PWIONIUM RfCYCU<br />

Fig. 6.2-14. Relative Nuclear Contri-<br />

butions of LWRs Located Inside (LWR-Pu) and<br />

Outside (LWR-U) <strong>Energy</strong> Centers (High-Cost<br />

u308 supply) -<br />

requirements do not differ significantly from<br />

those of <strong>the</strong> LWR on <strong>the</strong> throwaway cycle (see<br />

Fig. 6.2-2) because <strong>the</strong> nuclear growth pro-<br />

jection was specified to be 350 GWe in <strong>the</strong><br />

year 2000 plus 15 GWe/yr <strong>the</strong>reafter. Thus,<br />

<strong>the</strong> primary effect of reprocessing is to allow<br />

<strong>the</strong> nuclear system to grow beyond <strong>the</strong> 400-GWe<br />

level even though a scarcity of U308 exists<br />

at costs below $160/lb. Viewed.differently,<br />

<strong>the</strong> primary effect of reprocessing is not<br />

to support <strong>the</strong> construction of additional<br />

nuclear units in <strong>the</strong> earlier years when<br />

U308 is in plentiful supply.<br />

The installed nuclear capacity that must be located in <strong>the</strong> energy centers as a<br />

function of time is shown by <strong>the</strong> lower curve in Fig. 6.2-14, <strong>the</strong> difference between <strong>the</strong><br />

two curves indicating <strong>the</strong> nuclear capacity that can be made available outside <strong>the</strong> centers.<br />

The maximum capacity which must be located in <strong>the</strong> energy centers is approximately 260 GWe,<br />

while a maximum of 400 GWe can be available outside <strong>the</strong> center. For approximately three<br />

decades (from <strong>the</strong> year 2000 to <strong>the</strong> year 2030), over 300 GWe can be available outside <strong>the</strong><br />

centers. The use of plutonium recycle to allow <strong>the</strong> nuclear system to grow beyond <strong>the</strong><br />

400-GWe level as <strong>the</strong> U308 supply becomes scarce is vividly illustrated in Fig. 6.2-14.<br />

Note that <strong>the</strong> number of units loaded with plutonium increases significantly as <strong>the</strong> in-<br />

stalled capacity exceeds <strong>the</strong> 400-GWe level and that <strong>the</strong>y comprise an increasing fraction<br />

of <strong>the</strong> total installed capacity in later years.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!