05.08.2013 Views

ORNL-5388 - the Molten Salt Energy Technologies Web Site

ORNL-5388 - the Molten Salt Energy Technologies Web Site

ORNL-5388 - the Molten Salt Energy Technologies Web Site

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1<br />

i<br />

i<br />

3-20<br />

3.3.2. Fabrication and Handling of Denatured Fuel<br />

J. D. Jenkins R. E. Brooksbank<br />

Oak Ridge National Laboratory<br />

The techniques required for fabricating and handling 233U-containing fuels encount-<br />

ered in <strong>the</strong> denatured fuel cycle differ from those employed for 235U fuels because of <strong>the</strong><br />

high gamma-ray and alpha-particle activities present in <strong>the</strong> 233U fuels. Some idea of <strong>the</strong><br />

radiation levels that will be encountered can be deduced from recent radiation measure-<br />

ments for a can that contains 500 g of 233U with a 232U content of 250 ppm and has been<br />

aged 12 years since purification. The results were as follows:<br />

Distance Radiation (mr/hr)<br />

Contact 250,000<br />

1 ft 20,000<br />

3 ft 2,000<br />

These radiation levels are equivalent to those that could be expected at <strong>the</strong> same distances<br />

from 500 g of 233U containing % 1250 ppm 232U and aged six months, which is comparable with<br />

233U that has undergone several cycles in a fast breeder reactor. With such high activities,<br />

complete alpha containment of <strong>the</strong> fuel will be required, and all personnel must be protected<br />

from <strong>the</strong> fuel with thick biological shielding (several feet of concrete or <strong>the</strong> equivalent).<br />

This, of course, necessitates remote-handling operations, which constitutes an inherent<br />

safeguard against <strong>the</strong> diversion of <strong>the</strong> fuel while it is being fabricated and/or handled.<br />

The requirement for remote operation is fur<strong>the</strong>r borne out by experience gained in<br />

two earlier programs in which 233U-containing fuels were fabricated.<br />

In <strong>the</strong>se two pro-<br />

grams, <strong>the</strong> "Kilorod" program' and <strong>the</strong> Light Water Breeder Reactor (LWBR) program,2<br />

(233U,Th)02 pellets could be fabricated in glove boxes, but only because <strong>the</strong> 233U used<br />

contained extremely low (

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!