29.08.2014 Views

adopted operating & capital improvement budget - City of St ...

adopted operating & capital improvement budget - City of St ...

adopted operating & capital improvement budget - City of St ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>City</strong> <strong>of</strong> <strong>St</strong>. Petersburg, Florida<br />

FY 2010 Adopted Fiscal Plan<br />

Internal Services Administration<br />

<strong>St</strong>ormwater, Pavement & Traffic Operations Department<br />

Grants<br />

Shared Revenues<br />

General Government<br />

FY 2007 FY 2008 FY 2009 FY 2009 FY 2009 FY 2010 FY 2010<br />

Revenue Sources Actual Actual Adopted Amended Estimated Adopted Change<br />

Physical Environment Charges<br />

Transportation Charges<br />

Other Charges for Services<br />

Interest Earnings<br />

Sale <strong>of</strong> Fixed Assets<br />

Sale <strong>of</strong> Surplus Materials<br />

Contributions & Donations<br />

Miscellaneous Revenue<br />

Interfund Transfers<br />

Debt Proceeds<br />

General Operating Fund<br />

<strong>St</strong>ormwater Utility Operating Fund<br />

<strong>St</strong>ormwater Debt Service Fund<br />

- 12,945 -<br />

- 52,319 -<br />

193,827 193,672 205,000 205,000 198,699 205,000<br />

- 91 -<br />

-<br />

- -<br />

10,987,942 11,437,074 11,760,885 11,760,885 11,783,896 11,769,885<br />

- 663 -<br />

-<br />

(663) -<br />

440,785 522,127 303,000 303,000 411,222 303,000<br />

110,974 75,135 23,000 23,000 159,042 72,172<br />

49,035 31,003 12,000 12,000 48,011 12,000<br />

12,951 16,807 -<br />

-<br />

7,640 -<br />

- - -<br />

- 617,691 -<br />

(13,165) (4,106) (20,600) (20,600) (30,975) (51,000)<br />

1,133,407 1,032,890 1,050,000 1,050,000 1,055,060 1,050,000<br />

21,020,000 - -<br />

-<br />

- -<br />

3,601,839 3,877,695 3,943,772 3,964,967 3,189,639 3,752,916<br />

(270,891) (287,973) (818,383) (118,892) (771,024) (158,267)<br />

(16,475) (54,404) -<br />

- (3,243) (9,096)<br />

- %<br />

- %<br />

- %<br />

0.1%<br />

- %<br />

- %<br />

213.8%<br />

- %<br />

- %<br />

- %<br />

147.6%<br />

- %<br />

- %<br />

(4.8%)<br />

(80.7%)<br />

- %<br />

Total Revenue 37,250,229 16,853,619 16,458,674 17,179,360 16,717,314 16,946,610<br />

3.0%<br />

FY 2007 FY 2008 FY 2009 FY 2009 FY 2010 FY 2010<br />

Position Summary Actual Actual Adopted Estimated Adopted Change<br />

Pavement Maintenance Program<br />

Pavement Marking Program<br />

Sign Installation & Maintenance Program<br />

<strong>St</strong>reets Sweeping & Slope Mowing Program<br />

SW Utility Collection & Marine Infrastr Program<br />

SW, Pavement & Traffic Ops Admin Program<br />

Traffic Signals Program<br />

36.00 36.00 35.00<br />

32.00 32.00<br />

4.00 4.00 4.00<br />

4.00 4.00<br />

6.00 6.00 6.00<br />

6.00 5.00<br />

22.00 22.00 21.00<br />

21.00 21.00<br />

46.00 46.00 45.00<br />

43.00 38.00<br />

2.00 2.00 2.00<br />

2.00 2.00<br />

11.00 11.00 11.00<br />

11.00 11.00<br />

Total Full-Time FTE 127.00 127.00 124.00 119.00 113.00<br />

Pavement Maintenance Program<br />

2.00 2.00 2.00<br />

2.00 2.00<br />

<strong>St</strong>reets Sweeping & Slope Mowing Program<br />

0.50 0.50 0.50<br />

- -<br />

Total Part-Time FTE 2.50 2.50 2.50 2.00 2.00<br />

(8.6%)<br />

- %<br />

(16.7%)<br />

- %<br />

(15.6%)<br />

- %<br />

- %<br />

(8.9%)<br />

- %<br />

(100.0%)<br />

(20.0%)<br />

Total FTE<br />

129.50 129.50 126.50 121.00 115.00<br />

(9.1%)<br />

• The <strong>St</strong>ormwater, Pavement & Traffic Operations Department was created in FY06. The divisions supported by the General Fund assumed the<br />

sign installation and maintenance, pavement marking, and traffic signal programs <strong>of</strong> the former Engineering, <strong>St</strong>ormwater & Traffic Operations<br />

Department. They also assumed the traffic operations and support functions.<br />

• In FY09, five full-time positions (Maintenance Worker II, Truck Driver, Pavement Maintenance Foreman, <strong>St</strong>ormwater Utility Apprentice and<br />

Equipment Operator II) and one part-time Truck Driver were deleted.<br />

• In FY10, the department's <strong>budget</strong> will decrease by 4.6% in the General Fund and increase by 6.2% in the <strong>St</strong>ormwater Utility Operating Fund. The<br />

majority <strong>of</strong> the decrease is due to position reductions and the majority <strong>of</strong> the increase is due to a one-time increase in the transfer to the <strong>St</strong>ormwater<br />

Capital Projects Fund <strong>of</strong> $1,000,000.<br />

• A rate increase is not included in the FY10 <strong>budget</strong> for the <strong>St</strong>ormwater Utility Operating Fund.<br />

• A full-time Traffic Maintenance Foreman ($78,559), a full-time Equipment Operator I ($49,202), a full-time Equipment Operator II ($44,609), a<br />

full-time Equipment Operator III ($62,387) and two full-time <strong>St</strong>ormwater Utility Maintenance Techs ($96,770) will be deleted in FY10.<br />

Fiscal Year 2010 Budget Development P - 14 Internal Services Administration

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!