<strong>City</strong> <strong>of</strong> <strong>St</strong>. Petersburg, Florida<br />

2010 thru 2014 Capital Improvement Plan - Project Descriptions by Fund<br />

Recreation & Culture Capital Improvement Fund (3029)<br />

This fund was established in FY98 to account for recreation and culture <strong>improvement</strong>s funded from the Local Option Sales<br />

Surtax.<br />

Project Descriptions<br />

FY 2010<br />

Adopted<br />

Pier Elevators Refurbish - Rep 50,000<br />

In FY09, all four passenger elevators were modernized. The scenic/glass elevator will be refurbished/modernized in FY10.<br />

This is the main elevator to the observation deck for visitors without entering the tenant space on the 5th floor.<br />

Lake Maggiore/Boyd Hill 400,000<br />

This is a five year park <strong>improvement</strong> project that started in FY08 and continues through FY12. This project will provide for major<br />

changes, upgrades, and <strong>improvement</strong>s to various elements <strong>of</strong> the Lake Maggiore/Boyd Hill Park area.<br />

FY10: Renovation <strong>of</strong> the Osprey’s Roost building, aviary building for food preparation, medical care, and storage.<br />

FY11: Fence replacement along perimeter <strong>of</strong> preserve phase I; educational signage and exhibits along trails; trail<br />

enhancement and resurfacing phase I; replacement <strong>of</strong> tram and supply storage building.<br />

FY12: Construction <strong>of</strong> boardwalk along Lake Maggiore shoreline; restroom renovations in Boyd Hill Nature Preserve picnic<br />

area and camping area; cabin replacement; renovations to Oak Hall; lighting for Pinellas Pioneer Settlement.<br />

Resurface Tennis and Shuffleboard Courts 200,000<br />

All <strong>of</strong> the 66 hard surface tennis courts at 15 parks throughout the city require resurfacing every five years. Tennis and<br />

shufflleboard courts are scheduled for resurfacing in 2010. All support posts and nets were replaced in 2000.<br />

Pier Facility Improvements FY10 325,000<br />

These <strong>improvement</strong>s, which include several energy enhancement measures, will primarily consist <strong>of</strong> <strong>improvement</strong>s to the<br />

building envelope. Projects may include: building painting/waterpro<strong>of</strong>ing (color blocks only), re-seal windows on the 3rd & 4th<br />

floors, removal <strong>of</strong> light cans underneath the 3rd & 4th level exterior, 1st floor ro<strong>of</strong> repairs, and/or any higher priority or emergency<br />

project that may arise during the year.<br />

Parking Lot Repair FY10 56,000<br />

This project will provide for the refurbishment <strong>of</strong> selected parking lots at the <strong>City</strong>’s recreational and park facilities on an annual<br />

basis.<br />

Maximo Park Improvements 500,000<br />

This project provides for construction <strong>of</strong> a new restroom for the boat ramp area, picnic shelter, stabilization for the boat ramp<br />

area, six new replacement concrete boat ramps, security lighting, landscaping, and other park <strong>improvement</strong>s as needed.<br />

Coquina Key Improvements 350,000<br />

Construction <strong>of</strong> an observation/fishing dock, shoreline protection measures, parking lot paving and roadway, picnic facilities,<br />

landscaping, irrigation, and other park related <strong>improvement</strong>s.<br />

Sunken Gardens Parking Options - Conceptual 50,000<br />

Funding to study parking alternatives for Sunken Gardens.<br />

Grandview Park Improvements 500,000<br />

Improvements include new fishing docks, boardwalks, observation deck, picnic shelters, picnic pad area, park benches, paved<br />

parking area, landscaping, security lighting, and other site <strong>improvement</strong>s. This project would also incorporate the nearby area<br />

<strong>of</strong> Sunrise Park.<br />

Coliseum - Parking Lot Improvements 120,000<br />

Resurface and restripe all parking lot spaces at the Coliseum. Improve lighting and parking lot equipment. Replace parking lot<br />

attendant booths.<br />