29.08.2014 Views

adopted operating & capital improvement budget - City of St ...

adopted operating & capital improvement budget - City of St ...

adopted operating & capital improvement budget - City of St ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>City</strong> <strong>of</strong> <strong>St</strong>. Petersburg, Florida<br />

FY 2010 Adopted Fiscal Plan<br />

Internal Services Administration<br />

<strong>St</strong>ormwater, Pavement & Traffic Operations Department<br />

Objectives and Performance Measures<br />

Unit <strong>of</strong><br />

Measure<br />

FY 2007<br />

Actual<br />

FY 2008 FY 2009 FY 2009 FY 2010<br />

Actual Target Estimate Adopted<br />

Compliance with NPDES Permit<br />

An objective <strong>of</strong> the <strong>St</strong>ormwater, Pavement & Traffic Operations Department is to comply with our National Pollutant Discharge Elimination System<br />

(NPDES) permit.<br />

• Control Aquatic Weed Growth Acres<br />

5,250<br />

1,050<br />

1,050<br />

1,050<br />

1,050<br />

• Growth, Debris & Sediment Control Miles<br />

124<br />

120<br />

125<br />

125<br />

125<br />

• Line Cleaning - <strong>St</strong>ormwater Infrastructure Miles<br />

15,540 15,535 15,535 15,535 15,535<br />

• Roadway Miles Swept - <strong>St</strong>ormwater #<br />

18,690 22,428 22,428 22,428 22,428<br />

• Seawalls & Culverts Maintenance Miles/Feet<br />

188<br />

197<br />

197<br />

197<br />

197<br />

• Shallow Infrastructure Failures-<strong>St</strong>ormwater Feet<br />

1,530<br />

1,535<br />

1,535<br />

1,535<br />

1,535<br />

• <strong>St</strong>ormwater Infrastructure Replaced Feet<br />

1,530<br />

1,535<br />

1,535<br />

1,535<br />

1,535<br />

FDOT Roadway Sweeping<br />

The objective <strong>of</strong> the FDOT Sweeping Division is to reduce the amount <strong>of</strong> contaminates that enter the <strong>St</strong>ormwater removal system and to maintain<br />

the aesthetics <strong>of</strong> the roadways.<br />

• Roadway Miles Swept - <strong>St</strong>ormwater #<br />

18,690 14,952 14,952 14,952 14,952<br />

Mowing Maintenance<br />

The objective <strong>of</strong> the Mowing Operations Division is to maintain ditch banks, lake perimeters, and slopes to improve hydraulic performance as well<br />

as reduce erosion and potential health hazards in order to comply with our NPDES permit.<br />

• Erosion Control <strong>of</strong> Lakes & Slopes #<br />

1,130<br />

1,136<br />

1,136<br />

1,136<br />

1,136<br />

Pavement Maintenance<br />

The objective <strong>of</strong> the Traffic Support Division is to maintain the <strong>City</strong>’s paved and unpaved streets and alleys in a condition conducive to safe<br />

drivability and proper drainage flow.<br />

• Pavement Repair Backlog Locations<br />

3<br />

3<br />

3<br />

6<br />

• Pavement Repair Response Time Days<br />

2<br />

2<br />

2<br />

5<br />

• Sidewalk Repair Backlog Miles<br />

1<br />

1<br />

1<br />

2<br />

• Sidewalk Repair Response Time Month<br />

1<br />

1<br />

1<br />

2<br />

6<br />

5<br />

2<br />

2<br />

Pavement Marking<br />

The objective <strong>of</strong> the Traffic Marking Division is to provide a properly marked pavement system for the safe and efficient flow <strong>of</strong> traffic.<br />

• Lines In Thermoplastic Feet<br />

141,072 140,000 140,000<br />

• Lines Painted Feet<br />

139,628 140,000 140,000<br />

• Number <strong>of</strong> Symbols Each<br />

3,137<br />

3,500<br />

3,500<br />

140,000<br />

140,000<br />

3,500<br />

140,000<br />

140,000<br />

3,500<br />

Sign Fabrication, Installation, and Maintenance<br />

The objective <strong>of</strong> the Traffic Sign Fabrication and Traffic Sign Installation Divisions is to inform motorists and pedestrians <strong>of</strong> traffic regulations or<br />

information by sign installation and maintenance.<br />

• Damaged Signs Replaced #<br />

1,930<br />

2,335<br />

2,335<br />

2,335<br />

2,500<br />

• Signs Fabricated #<br />

9,942 11,930 14,316 14,316 14,500<br />

• Signs Installed/Replaced #<br />

7,190<br />

8,628 10,353 10,353 11,500<br />

Traffic Signals<br />

The objective <strong>of</strong> the Traffic Signals Division is to promote public safety through the installation and maintenance <strong>of</strong> a traffic signal system.<br />

• Number <strong>of</strong> Calls for Service #<br />

1,134<br />

1,019<br />

1,000<br />

• Number <strong>of</strong> Signals Maintained #<br />

298<br />

298<br />

298<br />

• Traffic Signal Calls Responded to in 30 Minutes #<br />

1,134<br />

950<br />

1,000<br />

• Work Order, En-Route & Trouble Calls #<br />

4,420<br />

3,909<br />

4,400<br />

1,100<br />

300<br />

1,000<br />

4,000<br />

1,100<br />

300<br />

1,000<br />

4,000<br />

Fiscal Year 2010 Budget Development P - 15 Internal Services Administration

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!