apts<br />
<strong>RFP</strong> – Excise e-Governance Project (<strong>EeGP</strong>) <strong>for</strong> Prohibition & Excise Department<br />
Confidential and Proprietary<br />
responsible <strong>for</strong> supporting Department in supervising, managing the Implementing<br />
Agency, monitoring and evaluating the development and implementation of the<br />
proposed project. The PMU shall also arrange <strong>for</strong> providing the required internet<br />
connectivity through leased line <strong>for</strong> a dedicated bandwidth as per the<br />
specifications given by the IA.<br />
2.10. Implementing Agency(IA)<br />
Implementing Agency is responsible to study, update, design, develop,<br />
implement and maintain the System. It will also operate and maintain the overall<br />
system solution <strong>for</strong> the full project duration. As an implementer of the project it<br />
has a major role to play.<br />
2.11. Responsibilities of Implementing Agency<br />
Development and Implementation<br />
1 Study all modules of Excise Department, Updating of the existing SRS and<br />
preparation of SRS <strong>for</strong> uncovered functionalities. Integration of existing<br />
applications into proposed services based software system. Facilitate to integrate<br />
with the data from barcodes <strong>for</strong> ‘track and trace’<br />
2 Testing and Implementation of developed modules<br />
3 Installation and commissioning of hardware required<br />
• Installation and commissioning of department server & systems at<br />
State Data Centre<br />
• Installation and commissioning of hardware required at all other<br />
locations such as Department’s Offices, other offices and units of<br />
other organizations.<br />
4 Integration with e-Seva/ CSCs shall be required <strong>for</strong> delivery of services through<br />
the above channels. The required in<strong>for</strong>mation about the database and the<br />
procedure to be adopted shall be provided by the department in consultation with<br />
the concerned department delivery mechanism.<br />
5 Mobile service delivery <strong>for</strong> appropriate services, to be identified by the<br />
department.<br />
Documentation, Maintenance and Support<br />
1. Maintenance, handholding and support to Department<br />
2. Ensure complete documentation related to design/update, development and<br />
implementation work is done and submitted to Department<br />
3. Ensure all milestones are completed within the agreed timeline<br />
4. Ensure meeting of all agreed SLAs<br />
<strong>AP</strong>TS : One Stop-Shop Solution provider <strong>for</strong> e-Governance.<br />