RFP for EeGP(EXCISE e-GOVERNANCE PROJECT) - AP Online
RFP for EeGP(EXCISE e-GOVERNANCE PROJECT) - AP Online
RFP for EeGP(EXCISE e-GOVERNANCE PROJECT) - AP Online
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
apts<br />
<strong>RFP</strong> – Excise e-Governance Project (<strong>EeGP</strong>) <strong>for</strong> Prohibition & Excise Department<br />
Confidential and Proprietary<br />
2.17. Procurement of IT infrastructure<br />
The IA shall procure & supply the IT Infrastructure <strong>for</strong> <strong>EeGP</strong> as proposed by them in<br />
their technical proposal. The IA shall ensure that all the equipment supplied to the<br />
Department is brand new and is free from any defect of any sort.<br />
1. IA may provide certain IT infrastructure like power backup, LAN (only at HQs<br />
etc.) compatible to the <strong>EeGP</strong> solution proposed by the IA on requirement basis:<br />
Sl<br />
No.<br />
Department / <strong>AP</strong>BCL<br />
No. of<br />
Users<br />
Floor Area<br />
(Approx.)<br />
2. IA is expected to liaise with the network solution provider <strong>for</strong> provision of<br />
the network connecting the above locations including DC / DRC <strong>for</strong> Intranet<br />
and Internet services. This is in addition to all the department and <strong>AP</strong>BCL<br />
offices.<br />
3. It is required to connect all the above locations through MPLS based<br />
connectivity with the Data Centre and Disaster Recovery sites. The IA is<br />
expected to size the network and bandwidth requirement with reasonable<br />
spare capacity such that the network can serve additional applications in future<br />
and meet the required SLAs as mentioned in the <strong>RFP</strong>.<br />
4. IA shall ensure configuration of both MPLS and Internet connectivity through<br />
the configuration of Quality of Service (QoS).<br />
5. IA need to provide the detailed items, specifications and qty. <strong>for</strong> all<br />
hardware including network components in the BOM <strong>for</strong>mat.<br />
2.18. IT Infrastructure Installation<br />
The IA shall be responsible <strong>for</strong> operationalization of the <strong>EeGP</strong> from end to end,<br />
which includes installation of IT Infrastructure and connecting the Excise<br />
database to all Data bases. The IA shall deploy the application software along<br />
with Hardware at the Data Centre and shall ensure that the application<br />
software services are made accessible to the <strong>EeGP</strong> users.<br />
2.19. Warranty<br />
The IA shall provide comprehensive warranty of one year (1) on developed software &<br />
Maintenance support <strong>for</strong> a period of 5 Years from Go- Live <strong>for</strong> all components<br />
supplied <strong>for</strong> the <strong>EeGP</strong> as per the contract. During the AMC period, the IA shall<br />
replace any parts/components of the IT Infrastructure supplied <strong>for</strong> this project if<br />
the components are defective and during the entire warranty period IA shall<br />
apply all the latest patches/updates <strong>for</strong> all the software components after<br />
appropriate testing. The Hardware warranty shall be <strong>for</strong> a period of 3 years.<br />
<strong>AP</strong>TS : One Stop-Shop Solution provider <strong>for</strong> e-Governance.<br />
Page: 21 of 124