23.11.2014 Views

RFP for EeGP(EXCISE e-GOVERNANCE PROJECT) - AP Online

RFP for EeGP(EXCISE e-GOVERNANCE PROJECT) - AP Online

RFP for EeGP(EXCISE e-GOVERNANCE PROJECT) - AP Online

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

apts<br />

<strong>RFP</strong> – Excise e-Governance Project (<strong>EeGP</strong>) <strong>for</strong> Prohibition & Excise Department<br />

Confidential and Proprietary<br />

Go-Live.<br />

2. Software Change & Version Control as per industry standards.<br />

3. IT Infrastructure Operations and Maintenance as per ITIL Standards <strong>for</strong> a period<br />

of 5 Years from Go-Live.<br />

4. Help Desk Support <strong>for</strong> <strong>EeGP</strong> Application is to be provided.<br />

5. Ensure shelf life of hardware and system software through necessary<br />

replacement and / or upgrade on or be<strong>for</strong>e 5th Year of the project period <strong>for</strong><br />

minimum Shelf life of 3 years<br />

2.16. Software Design, Development, Implementation, Training & Documentation<br />

Software Design<br />

The IA shall design the solution architecture & specifications <strong>for</strong> meeting the system<br />

requirement specifications finalized by the IA and approved by the department. The<br />

solution design shall include, but is not limited to the development of enterprise<br />

architecture, the design of the application architecture, user interface, database<br />

structures, deployment architecture, security architecture and network architecture. The<br />

existing applications needs to be taken into consideration.<br />

The IA should submit the solution design document to the Department and should<br />

obtain the sign off on the design document be<strong>for</strong>e commencing the development of<br />

the solution.<br />

Software Development/ Data Exchange<br />

IA shall develop the software based on the functional requirement specifications,<br />

system requirement specifications and design finalized <strong>for</strong> the functionalities. An<br />

industry-standard methodology shall be adopted <strong>for</strong> the Software Engineering,<br />

covering the entire SDLC. The IA shall follow the Implementation Model and<br />

Strategy <strong>for</strong> design and development of Application Modules and to ensure seamless<br />

data exchange by defining data exchange requirements, creating database<br />

schema and designing utilities <strong>for</strong> data exchange between Excise Database and other<br />

integrated service databases.<br />

Software Testing<br />

The IA shall design the Testing strategy including traceability matrix, Test Cases of the<br />

software developed. The <strong>EeGP</strong> system will have to undergo a comprehensive testing<br />

that shall include Unit Testing, System Testing, Integration Testing, Per<strong>for</strong>mance<br />

Testing, Load and Stress testing. The IA shall obtain the sign-off from the Department<br />

on testing approach and test plan.<br />

<strong>AP</strong>TS : One Stop-Shop Solution provider <strong>for</strong> e-Governance.<br />

Page: 19 of 124

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!