26.11.2014 Views

CETAC M-7600 Mercury Analyzer Operator's Manual

CETAC M-7600 Mercury Analyzer Operator's Manual

CETAC M-7600 Mercury Analyzer Operator's Manual

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>CETAC</strong> QuickTrace M-<strong>7600</strong> <strong>Mercury</strong> <strong>Analyzer</strong><br />

Chapter 3: Installing the <strong>Analyzer</strong><br />

1 The tubing from the output of the pump to the rinse station intake port is preconnected<br />

at the factory.<br />

Figure 3-4<br />

Pump Output to Rinse Intake Port.<br />

2 Locate in the completion kit the 6 mm (¼") OD Tygon ® tubing. The tubing will<br />

need to be cut to the appropriate lengths.<br />

3 Cut a 38 cm (15") length of tubing. This will run between the drain port of the<br />

rinse station and the rinse input of the peristaltic pump.<br />

4 Connect one end to the input of the outer pump channel.<br />

The pump rotates counterclockwise, so the inputs are on the top and the<br />

outputs are on the bottom.<br />

Figure 3-5<br />

Pump Input Connection from Rinse Drain.<br />

27

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!