CETAC M-7600 Mercury Analyzer Operator's Manual
CETAC M-7600 Mercury Analyzer Operator's Manual
CETAC M-7600 Mercury Analyzer Operator's Manual
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Operator’s <strong>Manual</strong><br />
Chapter 3: Installing the <strong>Analyzer</strong><br />
5 After 30 seconds press the Up button.<br />
6 Measure the water remaining in the cylinder, and calculate the flow rate.<br />
7 Park the sample probe.<br />
NOTE:<br />
When properly adjusted the tension on the bottom three peristaltic pump<br />
tubes (channels 1-3) should be the same and the tension screw for the top<br />
pump tube (reagent tube, channel 1) should be screwed in 1 to 2 mm farther<br />
than the other channels.<br />
Once the clamp tension on the pump tubing is established, relieve their<br />
stretch:<br />
8 Unclamp reagent and sample clamps.<br />
9 Park the sample probe.<br />
10 Press the Up button to remove the sample probe from the rinse station.<br />
11 Remove the reagent uptake tube from the SnCl 2.<br />
12 Allow the waste tube to empty.<br />
13 Unclamp waste tube clamps.<br />
14 Turn the pump off using the software controls.<br />
Do not leave tubes clamped in place when the system is not being used. The<br />
next time the system is used, hook the tubes and close the quick-release<br />
mechanisms. No screw adjustments will be needed. Previous clamp tension is<br />
“remembered” as the quick release is engaged and disengaged.<br />
74