26.11.2014 Views

CETAC M-7600 Mercury Analyzer Operator's Manual

CETAC M-7600 Mercury Analyzer Operator's Manual

CETAC M-7600 Mercury Analyzer Operator's Manual

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>CETAC</strong> QuickTrace M-<strong>7600</strong> <strong>Mercury</strong> <strong>Analyzer</strong><br />

Chapter 3: Installing the <strong>Analyzer</strong><br />

Step 9: Install the Gas-Liquid Separator (GLS)<br />

WARNING<br />

HANDLE WITH CARE<br />

Use care when handling the GLS. If the GLS breaks, there is a risk of cut<br />

from broken glass.<br />

Use only your fingers to tighten the fittings.<br />

1 Locate the gas-liquid separator (GLS).<br />

Liquid Mix (In)<br />

Gas Supply (In)<br />

Hg Vapor (Out, not<br />

connected until just<br />

before use)<br />

Drain (Out)<br />

Figure 3-44<br />

Gas-Liquid Separator (GLS).<br />

2 Locate the gas-liquid separator (GLS) and gently slide it into the holder with<br />

the drain and Hg vapor ports facing you. Raise it as far as it will go.<br />

Figure 3-45<br />

Placing the GLS.<br />

53

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!