Table 4.2.9.1<br />

Factors Affecting Choice of Junction Type<br />

Design Parameter<br />

Priority Junction<br />

Traffic Signal Junction<br />

Roundabout Junction<br />

Grade Separated Junction<br />

CAPACITY<br />

Low - moderate flows<br />

Moderate - high flows Moderate - high flows<br />

High flows<br />

DELAY<br />

At top end of flow range long<br />

delays experienced by minor<br />

road traffic<br />

Adjacent junctions can be linked<br />

to minimise delay. However<br />

unnecessary delay unavoidable<br />

during most quiet hours even<br />

with minimum cycle time<br />

Little delay if capacity not<br />

exceeded<br />

No delay to major through<br />

traffic. Little or no delay to<br />

minor turning movements<br />

SAFETY<br />

Relies heavily on driver<br />

judgement and is susceptible to<br />

accidents at top end of flow<br />

range<br />

Low right turn and pedestrian<br />

accident rate but may cause high<br />

rear end accident rate especially<br />

on high speed roads<br />

Generally the safest form of atgrade<br />

junction over a wide range<br />

of flows and speeds<br />

Some or all conflicting<br />

movements are removed with a<br />

consequent decrease in number<br />

of accidents. The few accidents<br />

which do occur may be severe<br />

owing to high speeds<br />

ECONOMIC<br />

CONSIDERAT-<br />

IONS<br />

Very low construction costs, but<br />

land take may be costly for<br />

larger physical island<br />

channelized junctions<br />

Generally very cost effective.<br />

Cost of equipment is offset by<br />

reduction in land take<br />

May be extravagant in terms of<br />

land take and consequently<br />

expensive. However check<br />

small and mini roundabout<br />

designs<br />

Construction costs are high but<br />

these should be offset against<br />

reduction in community costs<br />

through fewer accidents, less<br />

delay etc. G.S.I.'s can also be<br />

economic users of land<br />

PEDESTRIAN<br />

CONSIDERAT-<br />

IONS<br />

Small simple junctions and<br />

those with physical<br />

channelisation may adequately<br />

cater for pedestrian demand.<br />

Shadow islands however should<br />

be avoided if pedestrian flow is<br />

heavy<br />

Pedestrians can generally be<br />

catered for better at signals than<br />

at other at-grade junctions<br />

through positive indication<br />

Pedestrian routes through<br />

roundabout junctions may be<br />

diverse and unattractive.<br />

Subways and/or footbridges<br />

should be considered for heavy<br />

pedestrian demand<br />

Grade separated pedestrian<br />

facilities required