23.05.2015 Views

Space Link Extension - Service Management - CCSDS

Space Link Extension - Service Management - CCSDS

Space Link Extension - Service Management - CCSDS

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DRAFT RECOMMENDED STANDARD FOR SPACE LINK EXTENSION SERVICE MANAGEMENT<br />

Activity Diagram<br />

threePhaseOperationProcedurePatternActivity {UM, CM, RSP-I,<br />

RSP-AR, RSP-SR, RSP-FR,<br />

rspRoutineTimeout,<br />

rspUrgentTimeout}<br />

4.4.3 REQUIREMENTS<br />

4.4.3.1 UM Requirements for the REPLACE_SERVICE_PACKAGE Operation<br />

Table 4-43: UM Requirements for the RSP Operation<br />

RSPU-1<br />

RSPU-2<br />

RSPU-3<br />

RSPU-4<br />

RSPU-5<br />

UM shall conform to all Invoker Requirements for Three-Phase Operation Procedures as<br />

specified in 3.4.2.6.1.<br />

UM shall conform to all RSP-I Data Set Composition and Relationship Requirements when<br />

creating and transmitting a RSP-I as specified in table 4-45.<br />

UM should submit RSP-I messages that are valid with respect to all service management<br />

validation requirements for CM as defined in table 4-3.<br />

UM shall validate that a received RSP-AR, RSP-SR, or RSP-FR conforms to all RSP-AR,<br />

RSP-SR, or RSP-FR syntactic validation requirements specified in table 4-46, table 4-47, or<br />

table 4-49, respectively.<br />

If the return fails any of the syntactic validation requirements, UM shall process the message set<br />

containing the syntactically invalid return in accordance with the Invoker Requirements for<br />

Three-Phase Operation Procedures.<br />

UM shall validate that a received RSP-AR, RSP-SR, or RSP-FR conforms to all RSP-AR,<br />

RSP-SR, or RSP-FR service management validation requirements specified in table 4-46,<br />

table 4-47, or table 4-49, respectively.<br />

If the return fails any of the service management validation requirements, UM shall process the<br />

service management-invalid return in accordance with the Invoker Requirements for Three-<br />

Phase Operation Procedures.<br />

4.4.3.2 CM Requirements for the REPLACE_SERVICE_PACKAGE Operation<br />

Table 4-44: CM Requirements for the RSP Operation<br />

RSPC-1<br />

RSPC-2<br />

CM shall conform to CM requirements for the CSP operation specified in CSPC-1 and CSPC-4<br />

through CSPC-26, with the substitution of RSP-I, RSP-SR, RSP-FR, and RSP-AR for CSP-<br />

I, CSP-SR, CSP-FR, and CSP-AR, respectively.<br />

CM shall validate that a received RSP-I conforms to all RSP-I syntactic validation<br />

requirements specified in table 4-45, Data Set Composition and Relationship Requirements for<br />

the RSP-I. If the RSP-I fails any of the syntactic requirements, CM shall process the message<br />

set containing the syntactically invalid invocation in accordance with the Performer<br />

Requirements for Three-Phase Operation Procedures.<br />

<strong>CCSDS</strong> 910.11-R-2 Page 4-52 March 2008

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!