23.05.2015 Views

Space Link Extension - Service Management - CCSDS

Space Link Extension - Service Management - CCSDS

Space Link Extension - Service Management - CCSDS

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DRAFT RECOMMENDED STANDARD FOR SPACE LINK EXTENSION SERVICE MANAGEMENT<br />

6.3.6.3 Data Set Composition and Relationship Requirements<br />

Table 6-15 defines the data set composition and relationship requirements for the ATP-FR<br />

message that are in addition to those of the <br />

stereotype.<br />

Table 6-15: Data Set Composition and Relationship Requirements for ATP-FR<br />

ATPD-11 The ATP-FR shall contain one TrajectoryPredictionReference data set.<br />

[syntactic validation]<br />

ATPD-12 The ATP-FR shall contain one or more AtpError data sets.<br />

[syntactic validation]<br />

ATPD-13 The value of the trajectoryRef parameter shall be the same as the value of the trajectoryId of<br />

the ATP-I to which this return responds.<br />

[service management validation]<br />

6.4 DELETE_TRAJECTORY_PREDICTION (DTP) OPERATION<br />

6.4.1 PURPOSE<br />

The DELETE_TRAJECTORY_PREDICTION (DTP) operation allows UM to instruct CM to<br />

remove a previously installed Trajectory Prediction from the set of Trajectory Predictions<br />

resident at CM for a given <strong>Service</strong> Agreement.<br />

6.4.2 PROCEDURE<br />

The procedure for the DTP operation is that for a two-phase operation procedure, which<br />

follows the two-phase operation procedure pattern specified in 3.4.1.2.<br />

The DTP operation involves the exchange of the following messages:<br />

– DeleteTrajectoryPredictionInvocation (DTP-I);<br />

– DeleteTrajectoryPredictionSuccessfulReturn (DTP-SR);<br />

– DeleteTrajectoryPredictionFailedReturn (DTP-FR).<br />

The message sequence diagram for the DELETE_TRAJECTORY_PREDICTION operation<br />

conforms to the stereotyped sequence diagram for the two-phase operation messaging pattern<br />

defined in 3.4.1.3, with the following argument list:<br />

twoPhaseOperationProcedurePatternSequence {UM, CM, DTP-I, DTP-SR,<br />

DTP-FR}<br />

The activity diagram for the DELETE_TRAJECTORY_PREDICTION operation conforms to<br />

the stereotyped activity diagram for the two-phase operation procedure pattern defined in<br />

3.4.1.5, with the following argument list:<br />

<strong>CCSDS</strong> 910.11-R-2 Page 6-13 March 2008

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!