23.05.2015 Views

Space Link Extension - Service Management - CCSDS

Space Link Extension - Service Management - CCSDS

Space Link Extension - Service Management - CCSDS

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DRAFT RECOMMENDED STANDARD FOR SPACE LINK EXTENSION SERVICE MANAGEMENT<br />

SASD-7<br />

For the <strong>Service</strong>PackageReference data set the servicePackageRef shall have the<br />

same value as the servicePackageRef in the SAS-I message.<br />

[service management validation]<br />

4.7 APPLY_NEW_TRAJECTORY (ANT) OPERATION<br />

4.7.1 PURPOSE<br />

The APPLY_NEW_TRAJECTORY (ANT) operation allows UM to apply a new (or different)<br />

trajectory to an existing <strong>Service</strong> Package at CM. The trajectory being applied to the existing<br />

<strong>Service</strong> Package must already exist at CM.<br />

4.7.2 PROCEDURE<br />

The procedure for the ANT operation is that for a three-phase operation procedure, which<br />

follows the three-phase operation procedure pattern specified in 3.4.2.<br />

The ANT operation involves the exchange of the following messages:<br />

– ApplyNewTrajectoryInvocation (ANT-I);<br />

– ApplyNewTrajectorySuccessfulReturn (ANT-SR);<br />

– ApplyNewTrajectoryFailedReturn (ANT-FR);<br />

– ApplyNewTrajectoryAcknowledgedReturn (ANT-AR).<br />

The message sequence diagram for the APPLY_NEW_TRAJECTORY operation conforms to<br />

the stereotyped sequence diagram for the three-phase operation messaging pattern defined in<br />

3.4.2.3, with the following argument list:<br />

threePhaseOperationProcedurePatternSequence {UM, CM, ANT-I,<br />

ANT-AR, ANT-SR, ANT-FR}<br />

The activity diagram for the APPLY_NEW_TRAJECTORY operation conforms to the<br />

stereotyped activity diagram for the three-phase operation procedure pattern defined in<br />

3.4.2.4, with the following argument list:<br />

threePhaseOperationProcedurePatternActivity {UM, CM, ANT-I,<br />

ANT-AR, ANT-SR, ANT-FR,<br />

antRoutineTimeout,<br />

antUrgentTimeout }<br />

<strong>CCSDS</strong> 910.11-R-2 Page 4-73 March 2008

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!