23.05.2015 Views

Space Link Extension - Service Management - CCSDS

Space Link Extension - Service Management - CCSDS

Space Link Extension - Service Management - CCSDS

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DRAFT RECOMMENDED STANDARD FOR SPACE LINK EXTENSION SERVICE MANAGEMENT<br />

threePhaseOperationProcedurePatternActivity {UM, CM, ARTSP-I,<br />

ARTSP-AR, ARTSP-SR,<br />

ARTSP-FR<br />

artspRoutineTimeout,<br />

artspUrgentTimeout}<br />

5.10.3 REQUIREMENTS<br />

5.10.3.1 UM Requirements for the ADD_RETRIEVAL_TRANSFER_SERVICE_-<br />

PROFILE Operation<br />

Table 5-89: UM Requirements for the ARTSP Operation<br />

ARTSPU-<br />

01<br />

ARTSPU-<br />

02<br />

ARTSPU-<br />

03<br />

ARTSPU-<br />

04<br />

ARTSPU-<br />

05<br />

UM shall conform to all ARTSP-I Data Set Composition and Relationship Requirements when<br />

creating and transmitting an ARTSP-I as specified in table 5-95.<br />

UM shall conform to all Invoker Requirements for Three-Phase Operation Procedures as specified<br />

in 3.4.2.6.1.<br />

UM should send ARTLSP-I messages that are valid with respect to all service management<br />

validation requirements for CM as defined in table 5-95.<br />

UM shall validate that a received ARTSP-AR, ARTSP-SR, or ARTSP-FR conforms to all<br />

ARTSP-AR, ARTSP-SR, or ARTSP-FR syntactic validation requirements specified in table 5-96,<br />

table 5-97, or table 5-99, respectively. If the return fails any of the syntactic validation<br />

requirements, UM shall process the message set containing the syntactically invalid return in<br />

accordance with the Invoker Requirements for Three-Phase Operation Procedures.<br />

UM shall validate that a received ARTSP-AR, ARTSP-SR, or ARTSP-FR conforms to all<br />

ARTSP-AR, ARTSP-SR, or ARTSP-FR service management validation requirements specified in<br />

table 5-96, table 5-97, or table 5-99, respectively. If the return fails any of the service management<br />

validation requirements, UM shall process the service management-invalid return in accordance<br />

with the Invoker Requirements for Three-Phase Operation Procedures.<br />

5.10.3.2 CM Requirements for the ADD_RETRIEVAL_TRANSFER_SERVICE_-<br />

PROFILE Operation<br />

Table 5-90: CM Requirements for the ARTSP Operation<br />

ARTSPC-01 CM shall conform to all Performer Requirements for Three-Phase Operation Procedures as<br />

specified in 3.4.2.6.2.<br />

ARTSPC-02 CM shall validate that a received ARTSP-I conforms to all ARTSP-I syntactic validation<br />

requirements specified in table 5-95, Data Set Composition and Relationship Requirements for the<br />

ARTSP-I. If the ARTSP-I fails any of the syntactic requirements, CM shall process the message<br />

set containing the syntactically invalid invocation in accordance with the Performer Requirements<br />

for Three-Phase Operation Procedures.<br />

<strong>CCSDS</strong> 910.11-R-2 Page 5-91 March 2008

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!