23.05.2015 Views

Space Link Extension - Service Management - CCSDS

Space Link Extension - Service Management - CCSDS

Space Link Extension - Service Management - CCSDS

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DRAFT RECOMMENDED STANDARD FOR SPACE LINK EXTENSION SERVICE MANAGEMENT<br />

5.11.3 REQUIREMENTS<br />

5.11.3.1 UM Requirements for the DELETE_TRANSFER_SERVICE_PROFILE<br />

Operation<br />

Table 5-100: UM Requirements for the DTSP Operation<br />

DTSPU-01 UM shall conform to all Invoker Requirements for Two-Phase Operation Procedures as specified<br />

in 3.4.1.6.1.<br />

DTSPU-02 UM shall conform to all DTSP-I Data Set Composition and Relationship Requirements when<br />

creating and transmitting an DTSP-I as specified in table 5-102.<br />

DTSPU-03 UM should send DTSP-I messages that are valid with respect to all service management<br />

validation requirements for CM as defined in table 5-102.<br />

DTSPU-04 UM shall validate that a received DTSP-SR or DTSP-FR conforms to all DTSP-SR or DTSP-FR<br />

syntactic validation requirements specified in table 5-103 or table 5-104, respectively. If the return<br />

fails any of the syntactic validation requirements, UM shall process the message set containing the<br />

syntactically invalid return in accordance with the Invoker Requirements for Two-Phase<br />

Operation Procedures.<br />

DTSPU-05 UM shall validate that a received DTSP-SR or DTSP-FR conforms to all DTSP-SR or DTSP-FR<br />

service management validation requirements specified in table 5-103 or table 5-105, respectively.<br />

If the return fails any of the service management validation requirements, UM shall process the<br />

service management-invalid return in accordance with the Invoker Requirements for Two-Phase<br />

Operation Procedures.<br />

5.11.3.2 CM Requirements for the DELETE_TRANSFER_SERVICE_PROFILE<br />

Operation<br />

Table 5-101: CM Requirements for the DTSP Operation<br />

DTSPC-01 CM shall conform to all Performer Requirements for Two-Phase Operation Procedures as<br />

specified in 3.4.1.6.2.<br />

DTSPC-02 CM shall validate that a received DTSP-I conforms to all DTSP-I syntactic validation<br />

requirements specified in table 5-102, Data Set Composition and Relationship Requirements for<br />

the DTSP-I. If the DTSP-I fails any of the syntactic requirements, CM shall process the<br />

message set containing the syntactically invalid return in accordance with the Performer<br />

Requirements for Two-Phase Operation Procedures.<br />

DTSPC-03 CM shall validate that the DTSP-I conforms to all DTSP-I service management validation<br />

requirements specified in this table and table 5-102, Data Set Composition and Relationship<br />

Requirements. If the DTSP-I fails any of the service management requirements, CM shall cease<br />

processing the DTSP-I and respond to UM with an DTSP-FR message. The content of the<br />

DTSP-FR depends on the nature of the validation failure, and is specified in table 5-104.<br />

DTSPC-04 CM shall validate that the transfer<strong>Service</strong>ProfileRef matches the<br />

transfer<strong>Service</strong>ProfileId for a Transfer <strong>Service</strong> Profile within the context of the<br />

referenced <strong>Service</strong> Agreement.<br />

[service management validation]<br />

<strong>CCSDS</strong> 910.11-R-2 Page 5-101 March 2008

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!