23.05.2015 Views

Space Link Extension - Service Management - CCSDS

Space Link Extension - Service Management - CCSDS

Space Link Extension - Service Management - CCSDS

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DRAFT RECOMMENDED STANDARD FOR SPACE LINK EXTENSION SERVICE MANAGEMENT<br />

6.3 ADD_TRAJECTORY_PREDICTION (ATP) OPERATION<br />

6.3.1 PURPOSE<br />

The ADD_TRAJECTORY_PREDICTION (ATP) operation allows UM to add a new<br />

Trajectory Prediction at CM.<br />

6.3.2 PROCEDURE<br />

The procedure for the ATP operation is that for a two-phase operation procedure, which<br />

follows the two-phase operation procedure pattern specified in 3.4.1.2.<br />

The ATP operation involves the exchange of the following messages:<br />

– AddTrajectoryPredictionInvocation (ATP-I);<br />

– AddTrajectoryPredictionSuccessfulReturn (ATP-SR);<br />

– AddTrajectoryPredictionFailedReturn (ATP-FR).<br />

The message sequence diagram for the ADD_TRAJECTORY_PREDICTION operation<br />

conforms to the stereotyped sequence diagram for the two-phase operation messaging pattern<br />

defined in 3.4.1.3, with the following argument list:<br />

twoPhaseOperationProcedurePatternSequence {UM, CM, ATP-I, ATP-SR,<br />

ATP-FR}<br />

The activity diagram for the ADD_TRAJECTORY_PREDICTION operation conforms to the<br />

stereotyped activity diagram for the two-phase operation procedure pattern defined in<br />

3.4.1.5, with the following argument list:<br />

twoPhaseOperationProcedurePatternActivity {UM, CM, ATP-I, ATP-SR,<br />

ATP-FR, atpRoutineTimeout,<br />

atpUrgentTimeout}<br />

<strong>CCSDS</strong> 910.11-R-2 Page 6-3 March 2008

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!