23.05.2015 Views

Space Link Extension - Service Management - CCSDS

Space Link Extension - Service Management - CCSDS

Space Link Extension - Service Management - CCSDS

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DRAFT RECOMMENDED STANDARD FOR SPACE LINK EXTENSION SERVICE MANAGEMENT<br />

4.8 SERVICE_PACKAGE_CANCELLED (SPC) OPERATION<br />

4.8.1 PURPOSE<br />

The SERVICE_PACKAGE_CANCELLED (SPC) Operation allows CM to notify UM that it<br />

has cancelled a <strong>Service</strong> Package from its operational schedule.<br />

4.8.2 PROCEDURE<br />

The procedure for the SPC operation is a Notified Operation procedure, which follows the<br />

notified operation procedure pattern specified in 3.4.3.<br />

The SPC operation involves the exchange of the following messages:<br />

– <strong>Service</strong>PackageCancelledNotification (SPC-N);<br />

– <strong>Service</strong>PackageCancelledConfirmation (SPC-C).<br />

The sequence and activity diagrams for the SERVICE_PACKAGE_CANCELLED are the<br />

notified operation procedure pattern sequence and activity diagrams specified in 3.4.3.3 and<br />

3.4.3.4, respectively, with the argument lists:<br />

Sequence Diagram<br />

notifiedOperationProcedurePatternSequence {CM, UM, SPC-N, SPC-C}<br />

Activity Diagram<br />

notifiedOperationProcedurePatternActivity {CM, UM, SPC-N, SPC-C}<br />

4.8.3 REQUIREMENTS<br />

4.8.3.1 UM Requirements for the SERVICE_PACKAGE_CANCELLED Operation<br />

Table 4-74: UM Requirements for the SPC Operation<br />

SPCU-1<br />

SPCU-2<br />

SPCU-3<br />

UM shall conform to all Recipient Requirements for Notified Operation Procedures as<br />

specified in 3.4.3.6.2.<br />

UM shall validate that a received SPC-N conforms to all SPC-N syntactic validation<br />

requirements specified in table 4-77. If the notification fails any of the syntactic validation<br />

requirements, UM shall process the message set containing the syntactically invalid notification<br />

in accordance with the Recipient Requirements for Notified Operation Procedures as defined<br />

in table 3-37.<br />

UM shall validate that a received SPC-N conforms to all SPC-N service management<br />

validation requirements specified in this table and table 4-77. If the notification fails any of the<br />

service management validation requirements, UM shall process the service managementinvalid<br />

notification in accordance with the Recipient Requirements for Notified Operation<br />

Procedures as defined in table 3-37.<br />

<strong>CCSDS</strong> 910.11-R-2 Page 4-83 March 2008

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!