23.05.2015 Views

Space Link Extension - Service Management - CCSDS

Space Link Extension - Service Management - CCSDS

Space Link Extension - Service Management - CCSDS

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DRAFT RECOMMENDED STANDARD FOR SPACE LINK EXTENSION SERVICE MANAGEMENT<br />

Activity Diagram<br />

twoPhaseOperationProcedurePatternActivity {UM, CM, QSP-I,<br />

QSP-SR, QSP-FR<br />

qspRoutineTimeout,<br />

qspUrgentTimeout}<br />

4.10.3 REQUIREMENTS<br />

4.10.3.1 UM Requirements for the QUERY_SERVICE_PACKAGE Operation<br />

Table 4-85: UM Requirements for QSP Operation<br />

QSPU-1<br />

QSPU-2<br />

QSPU-3<br />

QSPU-4<br />

UM shall conform to all Invoker Requirements for Two-Phase Operation Procedures as<br />

specified in 3.4.1.6.1.<br />

UM shall conform to all QSP-I Data Set Composition and Relationship Requirements when<br />

creating and transmitting an QSP-I as specified in table 4-87.<br />

UM shall validate that a received QSP-SR or QSP-FR conforms to QSP-SR or QSP-FR<br />

syntactic validation requirements specified in table 4-88 or table 4-89, respectively. If the<br />

return fails any of the syntactic validation requirements, UM shall process the message set<br />

containing the syntactically invalid return in accordance with the Invoker Requirements for<br />

Two-Phase Operation Procedures.<br />

UM shall validate that a received QSP-SR or QSP-FR conforms to all QSP-SR or QSP-FR<br />

service management validation requirements specified in table 4-88 or table 4-89, respectively.<br />

If the return fails any of the service management validation requirements, UM shall process the<br />

service management-invalid return in accordance with the Invoker Requirements for Two-<br />

Phase Operation Procedures.<br />

4.10.3.2 CM Requirements for the QUERY_SERVICE_PACKAGE Operation<br />

Table 4-86: CM Requirements for QSP Operation<br />

QSPC-1<br />

QSPC-2<br />

QSPC-3<br />

CM shall conform to all Performer Requirements for Two-Phase Operation Procedures as<br />

specified in 3.4.1.6.2.<br />

CM shall validate that a received QSP-I conforms to all QSP-I syntactic validation<br />

requirements specified in table 4-87, Data Set Composition and Relationship Requirements for<br />

the QSP-I. If the QSP-I fails any of the syntactic requirements, CM shall process the<br />

message set containing the syntactically invalid invocation in accordance with the Performer<br />

Requirements for Two-Phase Operation Procedures.<br />

CM shall validate that the QSP-I conforms to all QSP-I service management validation<br />

requirements specified in this table and table 4-87, Data Set Composition and Relationship<br />

Requirements. If the QSP-I fails any of the service management requirements, CM shall cease<br />

processing the QSP-I and respond to UM with an QSP-FR message. The content of the QSP-<br />

FR depends on the nature of the validation failure, and is specified in table 4-89.<br />

<strong>CCSDS</strong> 910.11-R-2 Page 4-95 March 2008

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!