23.05.2015 Views

Space Link Extension - Service Management - CCSDS

Space Link Extension - Service Management - CCSDS

Space Link Extension - Service Management - CCSDS

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DRAFT RECOMMENDED STANDARD FOR SPACE LINK EXTENSION SERVICE MANAGEMENT<br />

The ASTSP operation involves the exchange of ADD_SLS_TRANSFER_SERVICE_-<br />

PROFILE messages. The ASLSP messages are: AddSlsTransfer<strong>Service</strong>Profile-<br />

Invocation (ASTSP-I), AddSlsTransfer<strong>Service</strong>ProfileAcknowledged-<br />

Return (ASTSP-AR), AddSlsTransfer<strong>Service</strong>ProfileSuccessfulReturn<br />

(ASTSP-SR), and AddSlsTransfer<strong>Service</strong>ProfileFailedReturn (ASTSP-FR).<br />

The message sequence diagram for the ADD_SLS_TRANSFER_SERVICE_PROFILE<br />

operation conforms to the stereotyped sequence diagram for the three-phase operation<br />

procedure pattern defined in 3.4.2.3, with the following argument list:<br />

threePhaseOperationProcedurePatternSequence {UM, CM, ASTSP-I,<br />

ASTSP-AR, ASTSP-SR,<br />

ASTSP-FR}<br />

The activity diagram for the ADD_SLS_TRANSFER_SERVICE_PROFILE operation<br />

conforms to the stereotyped activity diagram for the three-phase operation procedure pattern<br />

defined in 3.4.2.4, with the following argument list:<br />

threePhaseOperationProcedurePatternActivity {UM, CM, ASTSP-I,<br />

ASTSP-AR, ASTSP-SR,<br />

ASTSP-FR<br />

astspRoutineTimeout,<br />

astspUrgentTimeout}<br />

5.9.3 REQUIREMENTS<br />

5.9.3.1 UM Requirements for the ADD_SLS_TRANSFER_SERVICE_PROFILE<br />

Operation<br />

Table 5-75: UM Requirements for the ASTSP Operation<br />

ASTSPU-01 UM shall conform to all ASTSP-I Data Set Composition and Relationship Requirements when<br />

creating and transmitting an ASTSP-I as specified in table 5-81 and table 5-83.<br />

ASTSPU-02 UM shall conform to all Invoker Requirements for Three-Phase Operation Procedures as specified<br />

in 3.4.2.6.1.<br />

ASTSPU-03 UM should send ASTLSP-I messages that are valid with respect to all service management<br />

validation requirements for CM as defined table 5-83.<br />

ASTSPU-04 UM shall validate that a received ASTSP-AR, ASTSP-SR, or ASTSP-FR conforms to all<br />

ASTSP-AR, ASTSP-SR, or ASTSP-FR syntactic validation requirements specified in table 5-85,<br />

table 5-86, or table 5-88, respectively. If the return fails any of the syntactic validation<br />

requirements, UM shall process the message set containing the syntactically invalid return in<br />

accordance with the Invoker Requirements for Three-Phase Operation Procedures.<br />

<strong>CCSDS</strong> 910.11-R-2 Page 5-77 March 2008

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!