23.05.2015 Views

Space Link Extension - Service Management - CCSDS

Space Link Extension - Service Management - CCSDS

Space Link Extension - Service Management - CCSDS

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DRAFT RECOMMENDED STANDARD FOR SPACE LINK EXTENSION SERVICE MANAGEMENT<br />

twoPhaseOperationProcedurePatternActivity {UM, CM, DTP-I, DTP-SR,<br />

DTP-FR,<br />

dtpRoutineTimeout,<br />

dtpUrgentTimeout}<br />

6.4.3 REQUIREMENTS<br />

6.4.3.1 UM Requirements for the DELETE_TRAJECTORY_PREDICTION Operation<br />

Table 6-16: UM Requirements for the DTP Operation<br />

DTPU-01 UM shall conform to all Invoker Requirements for Two-Phase Operation Procedures as specified in<br />

3.4.1.6.1.<br />

DTPU-02 UM shall conform to all DTP-I Data Set Composition and Relationship Requirements when creating<br />

and transmitting a DTP-I as specified in table 6-18.<br />

DTPU-03 UM should send DTP-I messages that are valid with respect to all service management validation<br />

requirements for CM as defined in table 6-17.<br />

DTPU-04 UM shall validate that a received DTP-SR or DTP-FR conforms to all DTP-SR or DTP-FR syntactic<br />

validation requirements specified in table 6-19 and table 6-21, respectively. If the return fails any of the<br />

syntactic validation requirements, UM shall process the message set containing the syntactically invalid<br />

return in accordance with the Invoker Requirements for Two-Phase Operation Procedures.<br />

DTPU-05 UM shall validate that a received DTP-SR or DTP-FR conforms to all DTP-SR or DTP-FR service<br />

management validation requirements specified in table 6-19 and table 6-21, respectively. If the return<br />

fails any of the service management validation requirements, UM shall process the service management<br />

invalid return in accordance with the Invoker Requirements for Two-Phase Operation Procedures.<br />

6.4.3.2 CM Requirements for the DELETE_TRAJECTORY_PREDICTION Operation<br />

Table 6-17: CM Requirements for the DTP Operation<br />

DTPC-01<br />

DTPC-02<br />

DTPC-03<br />

DTPC-04<br />

CM shall conform to all Performer Requirements for Two-Phase Operation Procedures as specified in<br />

3.4.1.6.2.<br />

CM shall conform to all DTP-SR and DTP-FR Data Set Composition and Relationship Requirements<br />

when creating and transmitting a DTP-SR and DTP-FR, as specified in table 6-19 and table 6-21,<br />

respectively.<br />

CM shall validate that a received DTP-I conforms to all DTP-I syntactic validation requirements<br />

specified in table 6-18, Data Set Composition and Relationship Requirements for the DTP-I. If the<br />

DTP-I fails any of the syntactic requirements, CM shall process the message set containing the<br />

syntactically invalid invocation in accordance with the Performer Requirements for Two-Phase<br />

Operation Procedures.<br />

CM shall validate that the DTP-I conforms to all DTP-I service management validation requirements<br />

specified in this table and table 6-18, Data Set Composition and Relationship Requirements for the DTP-<br />

I. If the DTP-I fails any of the service management requirements, CM shall cease processing the DTP-<br />

I and respond to UM with an DTP-FR message. The content of the DTP-FR depends on the nature of<br />

the validation failure, and is specified in table 6-20.<br />

<strong>CCSDS</strong> 910.11-R-2 Page 6-14 March 2008

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!