23.05.2015 Views

Space Link Extension - Service Management - CCSDS

Space Link Extension - Service Management - CCSDS

Space Link Extension - Service Management - CCSDS

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DRAFT RECOMMENDED STANDARD FOR SPACE LINK EXTENSION SERVICE MANAGEMENT<br />

ASTSPU-05 UM shall validate that a received ASTSP-AR, ASTSP-SR, or ASTSP-FR conforms to all<br />

ASTSP-AR, ASTSP-SR, or ASTSP-FR service management validation requirements specified<br />

in table 5-85, table 5-86, or table 5-88, respectively. If the return fails any of the service<br />

management validation requirements, UM shall process the service management-invalid return in<br />

accordance with the Invoker Requirements for Three-Phase Operation Procedures.<br />

5.9.3.2 CM Requirements for the ADD_SLS_TRANSFER_SERVICE_PROFILE<br />

Operation<br />

Table 5-76: CM Requirements for the ASTSP Operation<br />

ASTSPC-01 CM shall conform to all Performer Requirements for Three-Phase Operation Procedures as<br />

specified in 3.4.2.6.2.<br />

ASTSPC-02 CM shall validate that a received ASTSP-I conforms to all ASTSP-I syntactic validation<br />

requirements specified in table 5-83, Data Set Composition and Relationship Requirements for the<br />

ASTSP-I. If the ASTSP-I fails any of the syntactic requirements, CM shall process the message<br />

set containing the syntactically invalid invocation in accordance with the Performer Requirements<br />

for Three-Phase Operation Procedures.<br />

ASTSPC-03 CM shall validate that the ASTSP-I conforms to all ASTSP-I service management validation<br />

requirements specified in this table and table 5-83 Data Set Composition and Relationship<br />

Requirements. If the ASTSP-I fails any of the service management requirements, CM shall cease<br />

processing the ASTSP-I and respond to UM with an ASTSP-FR message. The content of the<br />

ASTSP-FR depends on the nature of the validation failure, and is specified in table 5-88.<br />

ASTSPC-05 CM shall validate that each ASTSP-I parameter that is constrained by a <strong>Service</strong> Agreement<br />

parameter is consistent with the applicable <strong>Service</strong> Agreement parameter.<br />

[service management validation]<br />

ASTSPC-06 CM shall validate that all ASTSP-I parameter values that are related to each other (as defined in<br />

the Data Set Composition and Relationship Requirements) contain mutually compatible values.<br />

[service management validation]<br />

ASTSPC-07 If the SLE Complex has locally defined ASTSP-I relationship requirements in addition to those<br />

specified in this Recommended Standard, CM shall validate that the ASTSP-I conforms to all<br />

such local requirements.<br />

[service management validation]<br />

ASTSPC-08 If the ASTSP-I passes all syntactic and service management validation, CM shall:<br />

a) add the SLS Transfer <strong>Service</strong> Profile to the set of SLS Transfer <strong>Service</strong> Profiles available at CM;<br />

b) send an ASTSP-SR message to CM.<br />

[perform operation]<br />

ASTSPC-09 CM shall conform to all ASTSP-SR Data Set Composition and Relationship Requirements when<br />

creating and transmitting an ASTSP-SR as specified in table 5-86.<br />

ASTSPC-10 CM shall conform to all ASTSP-FR Data Set Composition and Relationship Requirements when<br />

creating and transmitting an ASTSP-FR as specified table 5-88.<br />

ASTSPC-11 CM shall conform to all ASTSP-AR Data Set Composition and Relationship Requirements when<br />

creating and transmitting an ASTSP-AR as specified in table 5-85.<br />

<strong>CCSDS</strong> 910.11-R-2 Page 5-78 March 2008

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!