23.05.2015 Views

Space Link Extension - Service Management - CCSDS

Space Link Extension - Service Management - CCSDS

Space Link Extension - Service Management - CCSDS

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DRAFT RECOMMENDED STANDARD FOR SPACE LINK EXTENSION SERVICE MANAGEMENT<br />

ASTSPU-05 UM shall validate that a received ASTSP-AR, ASTSP-SR, or ASTSP-FR conforms to all<br />

ASTSP-AR, ASTSP-SR, or ASTSP-FR service management validation requirements specified<br />

in table 5-85, table 5-86, or table 5-88, respectively. If the return fails any of the service<br />

management validation requirements, UM shall process the service management-invalid return in<br />

accordance with the Invoker Requirements for Three-Phase Operation Procedures.<br />

5.9.3.2 CM Requirements for the ADD_SLS_TRANSFER_SERVICE_PROFILE<br />

Operation<br />

Table 5-76: CM Requirements for the ASTSP Operation<br />

ASTSPC-01 CM shall conform to all Performer Requirements for Three-Phase Operation Procedures as<br />

specified in 3.4.2.6.2.<br />

ASTSPC-02 CM shall validate that a received ASTSP-I conforms to all ASTSP-I syntactic validation<br />

requirements specified in table 5-83, Data Set Composition and Relationship Requirements for the<br />

ASTSP-I. If the ASTSP-I fails any of the syntactic requirements, CM shall process the message<br />

set containing the syntactically invalid invocation in accordance with the Performer Requirements<br />

for Three-Phase Operation Procedures.<br />

ASTSPC-03 CM shall validate that the ASTSP-I conforms to all ASTSP-I service management validation<br />

requirements specified in this table and table 5-83 Data Set Composition and Relationship<br />

Requirements. If the ASTSP-I fails any of the service management requirements, CM shall cease<br />

processing the ASTSP-I and respond to UM with an ASTSP-FR message. The content of the<br />

ASTSP-FR depends on the nature of the validation failure, and is specified in table 5-88.<br />

ASTSPC-05 CM shall validate that each ASTSP-I parameter that is constrained by a <strong>Service</strong> Agreement<br />

parameter is consistent with the applicable <strong>Service</strong> Agreement parameter.<br />

[service management validation]<br />

ASTSPC-06 CM shall validate that all ASTSP-I parameter values that are related to each other (as defined in<br />

the Data Set Composition and Relationship Requirements) contain mutually compatible values.<br />

[service management validation]<br />

ASTSPC-07 If the SLE Complex has locally defined ASTSP-I relationship requirements in addition to those<br />

specified in this Recommended Standard, CM shall validate that the ASTSP-I conforms to all<br />

such local requirements.<br />

[service management validation]<br />

ASTSPC-08 If the ASTSP-I passes all syntactic and service management validation, CM shall:<br />

a) add the SLS Transfer <strong>Service</strong> Profile to the set of SLS Transfer <strong>Service</strong> Profiles available at CM;<br />

b) send an ASTSP-SR message to CM.<br />

[perform operation]<br />

ASTSPC-09 CM shall conform to all ASTSP-SR Data Set Composition and Relationship Requirements when<br />

creating and transmitting an ASTSP-SR as specified in table 5-86.<br />

ASTSPC-10 CM shall conform to all ASTSP-FR Data Set Composition and Relationship Requirements when<br />

creating and transmitting an ASTSP-FR as specified table 5-88.<br />

ASTSPC-11 CM shall conform to all ASTSP-AR Data Set Composition and Relationship Requirements when<br />

creating and transmitting an ASTSP-AR as specified in table 5-85.<br />

<strong>CCSDS</strong> 910.11-R-2 Page 5-78 March 2008

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!