23.05.2015 Views

Space Link Extension - Service Management - CCSDS

Space Link Extension - Service Management - CCSDS

Space Link Extension - Service Management - CCSDS

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DRAFT RECOMMENDED STANDARD FOR SPACE LINK EXTENSION SERVICE MANAGEMENT<br />

5.7.3 REQUIREMENTS<br />

5.7.3.1 UM Requirements for the DELETE_SPACE_LINK_EVENTS_PROFILE<br />

Operation<br />

Table 5-63: UM Requirements for the DSLEP Operation<br />

DSLEPU-01 UM shall conform to all Invoker Requirements for Two-Phase Operation Procedures as specified<br />

in 3.4.1.6.1.<br />

DSLEPU-02 UM shall conform to all DSLEP-I Data Set Composition and Relationship Requirements when<br />

creating and transmitting an DSLEP-I as specified in table 5-65.<br />

DSLEPU-03 UM should send DSLEP-I messages that are valid with respect to all service management<br />

validation requirements for CM as defined in table.<br />

DSLEPU-04 UM shall validate that a received DSLEP-SR or DSLEP-FR conforms to all DSLEP-SR or<br />

DSLEP-FR syntactic validation requirements specified in table 5-60 or table 5-62, respectively. If<br />

the return fails any of the syntactic validation requirements, UM shall process the message set<br />

containing the syntactically invalid return in accordance with the Invoker Requirements for Two-<br />

Phase Operation Procedures.<br />

DSLEPU-05 UM shall validate that a received DSLEP-SR or DSLEP-FR conforms to all DSLEP-SR or<br />

DSLEP-FR service management validation requirements specified in table 5-60 or table 5-62,<br />

respectively. If the return fails any of the service management validation requirements, UM shall<br />

process the service management-invalid return in accordance with the Invoker Requirements for<br />

Two-Phase Operation Procedures.<br />

5.7.3.2 CM Requirements for the DELETE_SPACE_LINK_EVENTS_PROFILE<br />

Operation<br />

Table 5-64: CM Requirements for the DSLEP Operation<br />

DSLEPC-01 CM shall conform to all Performer Requirements for Two-Phase Operation Procedures as<br />

specified in 3.4.1.6.2.<br />

DSLEPC-02 CM shall validate that a received DSLEP-I conforms to all DSLEP-I syntactic validation<br />

requirements specified in table 5-65, Data Set Composition and Relationship Requirements for the<br />

DSLEP-I. If the DSLEP-I fails any of the syntactic requirements, CM shall process the message<br />

set containing the syntactically invalid return in accordance with the Performer Requirements for<br />

Two-Phase Operation Procedures.<br />

DSLEPC-03 CM shall validate that the space<strong>Link</strong>EventsProfileRef matches the<br />

space<strong>Link</strong>EventsProfileId for a <strong>Space</strong> <strong>Link</strong> Events Profile within the context of the<br />

referenced <strong>Service</strong> Agreement.<br />

[service management validation]<br />

DSLEPC-04 CM shall validate that the space<strong>Link</strong>EventsProfileRef identifies an Events Profile that<br />

has no pending or executing <strong>Service</strong> Packages referencing it.<br />

[service management validation]<br />

DSLEPC-05 CM shall validate that the sleSmCreatorName associated with the DSLEP-I is the same as<br />

the sleSmCreatorName of the events associated with the space<strong>Link</strong>EventsProfileId<br />

referenced by the space<strong>Link</strong>EventsProfileRef in the DSLEP-I.<br />

[service management validation]<br />

<strong>CCSDS</strong> 910.11-R-2 Page 5-65 March 2008

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!