23.05.2015 Views

Space Link Extension - Service Management - CCSDS

Space Link Extension - Service Management - CCSDS

Space Link Extension - Service Management - CCSDS

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DRAFT RECOMMENDED STANDARD FOR SPACE LINK EXTENSION SERVICE MANAGEMENT<br />

Figure E-3: Activity Diagram 2<br />

Activity Diagram 3 is illustrated in figure E-4. It is an example of an activity diagram that is<br />

utilized or ‘called’ from another activity. As the intention is to have it utilized for multiple<br />

higher-level activities, it is parameterized. This example also identifies other graphical<br />

constructs used in the specification (such as ‘Parameter Pins’, etc.).<br />

Activity - notation for<br />

containing activity, which<br />

also specifies input(s) and<br />

output(s). Allows activity for<br />

use in other activities (as an<br />

Action).<br />

Parameter Pin -<br />

specifies an input<br />

from a parameter<br />

external to this<br />

activity<br />

Iterative Expansion Region<br />

- iterates through a list of<br />

incoming tokens. Each<br />

token follows the flow<br />

contained within the region<br />

Fill Order {timeOutParameter}<br />

iterative<br />

timeOutParameter<br />

item Find item in inventory<br />

Order<br />

list of items<br />

[available]<br />

Pack item<br />

items<br />

Shipment<br />

[unavailable]<br />

item<br />

Place on back-order<br />

Flow Final node - the<br />

end of a particular<br />

activity flow i.e. the Fill<br />

Order activity will<br />

continue to iterate<br />

despite reaching this<br />

node<br />

Figure E-4: Activity Diagram 3<br />

<strong>CCSDS</strong> 910.11-R-2 Page E-4 March 2008

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!