10.07.2015 Views

Floyd County Thoroughfare Plan - Floyd County Indiana - State of ...

Floyd County Thoroughfare Plan - Floyd County Indiana - State of ...

Floyd County Thoroughfare Plan - Floyd County Indiana - State of ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Floyd</strong> <strong>County</strong>, <strong>Indiana</strong><strong>Floyd</strong> <strong>County</strong> <strong>Thoroughfare</strong> <strong>Plan</strong>Section 5–Implementation and Next StepsRoadway Type CostCost to<strong>County</strong>Various (Bike Route)Install signs at 0.25 mileintervals97,000 19,000Luther RoadConstruct 4-foot bike lanes and(Old Vincennes Road to Paoli Pike)install signs750,000 150,000Old Vincennes RoadConstruct 4-foot bike lanes and(Luther Road to US 150)install signs620,000 62,000Schreiber RoadConstruct 4-foot bike lanes and(Luther Road to Old Vincennes Road)install signs480,000 120,000North Luther RoadConstruct 4-foot bike lanes and(West Willis Road to West Knable Road)install signs260,000 52,000Multi-use trail along Little Indian Creek Construct multi-use trail 5,600,000 1,100,000Paoli PikeConstruct 5-foot sidewalk on(Buffalo Trail to Luther Road)both sides170,000 34,000Scottsville RoadConstruct 5-foot sidewalk on(Paoli Pike to bridge near Starlight Road)one side88,000 18,000Old Vincennes RoadConstruct 5-foot sidewalk on(US 150 to Luther Road)one side103,000 21,000Schreiber RoadConstruct 5-foot sidewalk on(Luther Road to Old Vincennes Road)both sides130,000 26,000North Luther RoadConstruct 5-foot sidewalk on(West Willis Road to West Knable Road)both sides70,000 14,000Highlander Point to Edwardsville Gateway District Construct 5-foot sidewalk onone side200,000 40,000US 150Construct 5-foot sidewalk on(Barry Lane to Featheringill Road)both sides130,000 26,000Total 8,700,000 1,700,000For the multimodal projects the <strong>County</strong> is assumed to pay 20 percent <strong>of</strong> total construction costs.Table 5.02-3 Estimated Costs for Proposed Multimodal Improvement ProjectsPrepared by Strand Associates, Inc. ® 5-6KRH:pll\S:\@SIECO\001--050\046\008\Wrd\<strong>Thoroughfare</strong> <strong>Plan</strong>\Draft 07-19-07\S5-Implementation and Next Steps 07-19-07.doc\072007

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!