10.07.2015 Views

Floyd County Thoroughfare Plan - Floyd County Indiana - State of ...

Floyd County Thoroughfare Plan - Floyd County Indiana - State of ...

Floyd County Thoroughfare Plan - Floyd County Indiana - State of ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Floyd</strong> <strong>County</strong>, <strong>Indiana</strong><strong>Floyd</strong> <strong>County</strong> <strong>Thoroughfare</strong> <strong>Plan</strong>Section 4–Alternatives Evaluationix.SR 64 and Oaks RoadCurrently the intersection <strong>of</strong> SR 64 and Oaks Road operates poorly, and failsduring the PM peak-hour. Choosing to perform only the planned capacityexpansion will result in this intersection failing during both peak hours by2030.This intersection will require reconfiguration to accommodate projected futuretraffic volumes, and a traffic signal is required to provide adequate access toOaks Road. Traffic volumes suggest that two through lanes will be required ineach direction on SR 64. An eastbound SR 64 left-turn bay will be requiredand a right-turn bay will be required for westbound SR 64. Southbound OaksRoad will require the addition <strong>of</strong> a right-turn bay.Operations modeling indicates that with forecasted AM and PM peak-hourvolumes, the intersection configuration shown in Figure 4.01-25 operates atLOS B during both peak hours. All movements operate at LOS C or better.Figure 4.01-25SR 64 and Oaks Road ImprovementsPrepared by Strand Associates, Inc. ® 4-29KRH:pll\S:\@SIECO\001--050\046\008\Wrd\<strong>Thoroughfare</strong> <strong>Plan</strong>\Draft 07-19-07\S4-Alternative Evaluation 07-19-07.doc\072007

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!