10.07.2015 Views

Floyd County Thoroughfare Plan - Floyd County Indiana - State of ...

Floyd County Thoroughfare Plan - Floyd County Indiana - State of ...

Floyd County Thoroughfare Plan - Floyd County Indiana - State of ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Floyd</strong> <strong>County</strong>, <strong>Indiana</strong><strong>Floyd</strong> <strong>County</strong> <strong>Thoroughfare</strong> <strong>Plan</strong>Section 4–Alternatives Evaluation4. Edwardsville Galena RoadEdwardsville Galena Road operates at LOS C in the future no-build scenario. EdwardsvilleGalena Road is not expected to experience significant congestion issues by the year 2030.There are two main options to improve the operations for this corridor. The first optionwould be to widen the current driving lanes and construct shoulders. The second option isto reduce the number <strong>of</strong> access points. The reduction <strong>of</strong> access points is not likely to be asuitable option because all the access points are private driveways and eliminating themmay not be feasible.5. Baylor Wissman RoadBaylor Wissman Road operates at LOS B in the future no-build scenario. Baylor WissmanRoad is not expected to experience major congestion by the year 2030. To improve thesafety <strong>of</strong> the roadway, widening the travel lanes and adding shoulders could be considered..6. US 150The US 150 corridor will experience poor operations in the future no-build scenarios. Evenwith the planned two-way-left-turn-lane for the two lane portion <strong>of</strong> US 150 to the west <strong>of</strong>Brush College Road, significant congestion and delays can be expected. As the roadwayapproaches its capacity, drivers will seek other routes through <strong>Floyd</strong> <strong>County</strong>. The roadwaysmost likely to receive traffic diverted from US 150 are shown in Figure 4.01-1 and theyinclude:• Edwardsville-Galena Road–Old Vincennes Road• Old Vincennes Road• Paoli PikeSome drivers will travel at a different time, use a different mode, or eliminate their tripaltogether. These responses to congestion will reduce motor vehicle travel demand onUS 150 until it equals the roadway’s capacity.As congestion increases, it will become increasingly difficult to access the minor streetsthat branch <strong>of</strong>f <strong>of</strong> US 150 that do not have signal control. Several minor streets may requiretraffic signals to allow for access to the neighborhoods that they serve. Existing signalizedintersections will also have to be evaluated for the need <strong>of</strong> additional lanes, added phases,and possible corridor signal coordination.Improvements to the western portion <strong>of</strong> US 150 are deemed to be a priority. The volumesforecasted for the two-lane portion <strong>of</strong> US 150 west <strong>of</strong> Brush College Road are above typicaltwo-lane street capacity thresholds. Even with the addition <strong>of</strong> a center left turn lane, thevolume <strong>of</strong> traffic is still not sufficiently served. The most conventional way to fullyaccommodate these volumes would be expansion to a divided four-lane highway. Theintersections with minor roadways that will not receive signal control will be able to use themedian as a refuge. This allows the left-turn movements to be completed in two stages,requiring a gap in only one direction at a time.Prepared by Strand Associates, Inc. ® 4-2KRH:pll\S:\@SIECO\001--050\046\008\Wrd\<strong>Thoroughfare</strong> <strong>Plan</strong>\Draft 07-19-07\S4-Alternative Evaluation 07-19-07.doc\072007

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!