10.07.2015 Views

Floyd County Thoroughfare Plan - Floyd County Indiana - State of ...

Floyd County Thoroughfare Plan - Floyd County Indiana - State of ...

Floyd County Thoroughfare Plan - Floyd County Indiana - State of ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Floyd</strong> <strong>County</strong>, <strong>Indiana</strong><strong>Floyd</strong> <strong>County</strong> <strong>Thoroughfare</strong> <strong>Plan</strong>Section 4–Alternatives Evaluationand delays along the roadway in both the future AM and PM peak periods. As the roadwayapproaches its capacity, drivers will seek other routes through <strong>Floyd</strong> <strong>County</strong>. The roadwaysmost likely to receive traffic diverted from SR 62/64 are shown in Figure 4.01-2 and theyinclude:• Corydon Pike• Lanesville Road (Harrison <strong>County</strong>)–I-64Figure 4.01-2SR 62/64 Alternate RoutesSome drivers will travel at a different time, use a different mode, or eliminate their tripaltogether. These responses to congestion will reduce motor vehicle travel demand on thissection <strong>of</strong> SR 62/64 until it equals the roadways capacity.As the congestion increases, the unsignalized intersections will experience pooroperations, and vehicles will have difficulty making left turns from the minor streets ontoSR 62/64. Existing signalized intersections will have to be evaluated for the need <strong>of</strong>additional lanes, added phases, and possible corridor signal coordination.Prepared by Strand Associates, Inc. ® 4-4KRH:pll\S:\@SIECO\001--050\046\008\Wrd\<strong>Thoroughfare</strong> <strong>Plan</strong>\Draft 07-19-07\S4-Alternative Evaluation 07-19-07.doc\072007

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!