10.07.2015 Views

Floyd County Thoroughfare Plan - Floyd County Indiana - State of ...

Floyd County Thoroughfare Plan - Floyd County Indiana - State of ...

Floyd County Thoroughfare Plan - Floyd County Indiana - State of ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Floyd</strong> <strong>County</strong>, <strong>Indiana</strong><strong>Floyd</strong> <strong>County</strong> <strong>Thoroughfare</strong> <strong>Plan</strong>Section 2–Needs Identification3. <strong>County</strong> Line RoadTable 2.05-7 shows the results <strong>of</strong> the future no-build AM and PM intersection operationsassessment for the <strong>County</strong> Line Road study area.Location<strong>County</strong> Line Roadand CharlestownRoadGrant Line Road andChapel LaneOverallIntersection OpsLOS ALOS BIntersection OperationsAM Peak HourPM Peak HourLOS FOverallMovement(s) Intersection OpsLOS ALOS ALOS FMovement(s)Note: NBL = Northbound Left NBT = Northbound Through NBR = Northbound RightSBL = Southbound Left SBT = Southbound Through SBR = Southbound RightEBL = Eastbound Left EBT = Eastbound Through EBR = Eastbound RightWBL = Westbound Left WBT = Westbound Through WBR = Westbound RightTable 2.05-7 Future No-Build Intersection Operations from Synchro/SimTraffic along<strong>County</strong> Line RoadThe future no-build scenario for the <strong>County</strong> Line Road study area includes the plannedimprovement <strong>of</strong> Grant Line Road. Grant Line Road will be expanded to 5 lanes from ChapelLane into New Albany, and expanded to three lanes from Chapel Lane to Fairview KnobRoad. This improvement will also include the addition <strong>of</strong> a signal to the intersection <strong>of</strong>Grant Line Road and Chapel Lane.With the addition <strong>of</strong> the signal to the intersection <strong>of</strong> Grant Line Road and Chapel Lane the<strong>County</strong> Line Road study area operates acceptably for the future no-build scenario.Detailed future no-build traffic modeling results are located in Appendix B.Prepared by Strand Associates, Inc. ® 2-25KRH:pll\S:\@SIECO\001--050\046\008\Wrd\<strong>Thoroughfare</strong> <strong>Plan</strong>\Draft 07-19-07\S2-Needs Identification 07-19-07.doc\072007

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!