10.07.2015 Views

Floyd County Thoroughfare Plan - Floyd County Indiana - State of ...

Floyd County Thoroughfare Plan - Floyd County Indiana - State of ...

Floyd County Thoroughfare Plan - Floyd County Indiana - State of ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Floyd</strong> <strong>County</strong>, <strong>Indiana</strong><strong>Floyd</strong> <strong>County</strong> <strong>Thoroughfare</strong> <strong>Plan</strong>Section 2–Needs IdentificationA. Corridor OperationsIn the future 2030 traffic volume operational analysis all five corridors operate at LOS D or better,similar to existing conditions. Again, Paoli Pike and Old Vincennes Road suffer the worstoperations. Table 2.05-1 shows the results <strong>of</strong> the AM and PM corridor operations assessment.TimeLocation AM Peak Hour PM Peak Hour<strong>County</strong> Line Road LOS C LOS CPaoli Pike LOS D LOS DOld Vincennes Road LOS D LOS DEdwardsville Galena Road LOS C LOS CBaylor Wissman Road LOS B LOS BTable 2.05-1 Future No-Build Corridor LOS from HCSB. Intersection Operations1. US 150/Old Vincennes/Paoli PikeTable 2.05-2 shows the results <strong>of</strong> the future no-build AM and PM intersection operationsassessment for the intersections along US 150. Table 2.05-3 shows the results <strong>of</strong> the futureno-build AM and PM intersection operations assessment for the intersections along PaoliPike and Old Vincennes Road.Prepared by Strand Associates, Inc. ® 2-17KRH:pll\S:\@SIECO\001--050\046\008\Wrd\<strong>Thoroughfare</strong> <strong>Plan</strong>\Draft 07-19-07\S2-Needs Identification 07-19-07.doc\072007

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!