10.07.2015 Views

Floyd County Thoroughfare Plan - Floyd County Indiana - State of ...

Floyd County Thoroughfare Plan - Floyd County Indiana - State of ...

Floyd County Thoroughfare Plan - Floyd County Indiana - State of ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Floyd</strong> <strong>County</strong>, <strong>Indiana</strong><strong>Floyd</strong> <strong>County</strong> <strong>Thoroughfare</strong> <strong>Plan</strong>Section 4–Alternatives Evaluationii.SR 62 and Corydon Ridge RoadCurrently the intersection <strong>of</strong> SR 62 and Corydon Ridge Road operatesacceptably. Choosing not to perform capacity expansion will result in theintersection failing during the 2030 peak hours.The intersection will require reconfiguration to adequately accommodateprojected future traffic volumes, and a traffic signal will be required to allowfor access to Corydon Ridge Road. SR 62 will require an additional throughlane in each direction to allow proper traffic flow. A northbound left-turn bayand a southbound right-turn bay will also be required on SR 62. CorydonRidge Road will require a left-turn lane and a right-turn bay.Operations modeling indicates that with forecasted AM and PM peak-hourvolumes, the intersection configuration shown in Figure 4.01-18 operates atLOS B during the AM peak hour and LOS A during the PM peak hour. Allapproaches operate at LOS B or better.New Lane/BayCorydonRidge RoadSR 62NORTHFigure 4.01-18SR 62 and Corydon Ridge Road ImprovementsPrepared by Strand Associates, Inc. ® 4-22KRH:pll\S:\@SIECO\001--050\046\008\Wrd\<strong>Thoroughfare</strong> <strong>Plan</strong>\Draft 07-19-07\S4-Alternative Evaluation 07-19-07.doc\072007

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!