12.07.2015 Views

Adding gas from biomass to the gas grid - SGC

Adding gas from biomass to the gas grid - SGC

Adding gas from biomass to the gas grid - SGC

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Regeneration of <strong>the</strong> saturated adsorbent material is performed by a stepwise depressurisation of<strong>the</strong> adsorber vessel <strong>to</strong> atmospheric pressure and finally <strong>to</strong> near vacuum conditions. Initially <strong>the</strong>pressure is reduced by a pressure balance with an already regenerated adsorber vessel. This isfollowed by a second depressurisation step <strong>to</strong> almost atmospheric pressure. The <strong>gas</strong> leaving <strong>the</strong>vessel during this step contains significant amounts of methane and is recycled <strong>to</strong> <strong>the</strong> <strong>gas</strong> inlet.Finally, <strong>to</strong> achieve complete regeneration, <strong>the</strong> adsorber vessel is evacuated by a vacuum pump.Before <strong>the</strong> adsorption phase starts again, <strong>the</strong> adsorber vessel is repressurised stepwise <strong>to</strong> <strong>the</strong> finaladsorption pressure. After a pressure balance with an adsorber that has been in adsorption modebefore, <strong>the</strong> final pressure build-up is achieved with feed <strong>gas</strong>.Upgradedbio<strong>gas</strong>AdsorptionDepressuriseDesorptionPressuriseRaw bio<strong>gas</strong>Vent <strong>gas</strong>(CO2)CompressorVacuumpumpFigure 5: Bio<strong>gas</strong> upgrading with PSAPlant examplesParameter Unit Process Plant 1 Plant 2 Plant 3 Plant 4 Plant 5Location/nameNSR(pilot)Göteborg(pilot)Bromma Nuenen VAMWijsterCapacity range m 3 bio<strong>gas</strong>/h 10 – 20 12 -15 2 * 40010,000Input· methane%45 - 7558 - 6260· carbon dioxide %25 - 55 26 - 29 39 - 4139· nitrogen%< 1 0.5 - 1 0.5 - 11· hydrogen sulphide ppm0 - 2 0-2 not startedOutput· methane· carbon dioxide· dewpoint· hydrogen sulphideProcess conditions· adsorption pressure· adsorption temperature· regeneration pressure%%°C at 4 barppmBar°Cmbar (abs)< 2 5 70 - 739733 - 504-550 - 60100 - 20095 - 981 - 4-65 <strong>to</strong> -7006-1030100 - 20095 – 971.5 - 4-40 <strong>to</strong> -4501030100 - 200not startednot startedSupplier GPM Väst GPM Väst Hahnemann CIRMAC CIRMACInvestment M€ no data no data 1.24 6Operational costs k€/year no data no data not startedTable 12: Biomass upgrading with PSA56Excess H 2S (> 2 ppm) removed separatelyHigh pressure system includedpage: 37

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!