13.07.2015 Views

code of practice of electrical safety for work on or near high voltage

code of practice of electrical safety for work on or near high voltage

code of practice of electrical safety for work on or near high voltage

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

W<strong>or</strong>k by Pers<strong>on</strong>s Not Under the C<strong>on</strong>trol <str<strong>on</strong>g>of</str<strong>on</strong>g> Asset OwnerThe asset owner shall instruct the pers<strong>on</strong>c<strong>on</strong>trolling the <str<strong>on</strong>g>w<strong>or</strong>k</str<strong>on</strong>g> (not under the c<strong>on</strong>trol <str<strong>on</strong>g>of</str<strong>on</strong>g> theasset owner) that they are resp<strong>on</strong>sible <str<strong>on</strong>g>f<strong>or</strong></str<strong>on</strong>g> having asafe system <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>w<strong>or</strong>k</str<strong>on</strong>g> in place to avoid the risk from<str<strong>on</strong>g>electrical</str<strong>on</strong>g> hazard and will ensure all pers<strong>on</strong>s areaware <str<strong>on</strong>g>of</str<strong>on</strong>g> the safe system <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>w<strong>or</strong>k</str<strong>on</strong>g>.12.2 PERMIT TO WORK ADJACENT TONETWORK ASSETSWhere the safe system <str<strong>on</strong>g>of</str<strong>on</strong>g> access referred to inClause 12.1 is used it shall include the use <str<strong>on</strong>g>of</str<strong>on</strong>g> thepermit to <str<strong>on</strong>g>w<strong>or</strong>k</str<strong>on</strong>g> adjacent to net<str<strong>on</strong>g>w<strong>or</strong>k</str<strong>on</strong>g> assets.When a permit to <str<strong>on</strong>g>w<strong>or</strong>k</str<strong>on</strong>g> adjacent to net<str<strong>on</strong>g>w<strong>or</strong>k</str<strong>on</strong>g> assetsis required the asset owner shall require a writtenapplicati<strong>on</strong> to be submitted.The applicati<strong>on</strong> shall include sufficient in<str<strong>on</strong>g>f<strong>or</strong></str<strong>on</strong>g>mati<strong>on</strong>to enable the asset owner to determine appropriatec<strong>on</strong>trol measures to enable safe access.The procedure <str<strong>on</strong>g>f<strong>or</strong></str<strong>on</strong>g> the permit to <str<strong>on</strong>g>w<strong>or</strong>k</str<strong>on</strong>g> adjacent t<strong>on</strong>et<str<strong>on</strong>g>w<strong>or</strong>k</str<strong>on</strong>g> assets shall include:• An approved issuer;• Nominated pers<strong>on</strong> in charge <str<strong>on</strong>g>of</str<strong>on</strong>g> the <str<strong>on</strong>g>w<strong>or</strong>k</str<strong>on</strong>g>;• C<strong>on</strong>trol measures (precauti<strong>on</strong>s) undertakenBlue Book – December 2005 Page 117 <str<strong>on</strong>g>of</str<strong>on</strong>g> 148

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!