21.07.2015 Views

OPERATION MANUAL - Scintrex

OPERATION MANUAL - Scintrex

OPERATION MANUAL - Scintrex

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Operating the CG-5 in the FieldInitializing Field ParametersThere are three sets of parameters to be initialized prior to performing a fieldsurvey. Some of these you may already have completed by now but weprovide a quick summary for completeness. Parameters include:• Autograv parameters• Survey parameters• Read time, cycle time, Auto Station increment in the OPTIONS screen.Setting up Autograv ParametersBefore you begin your survey, you may want to check that you haveinitialized all required Autograv parameters. These include:• Tide Corrections• Continuous Tilt Correction• Auto Rejection• Terrain Correction• Seismic Filter• Save Raw DataFor a description of the initialization process, please see Chapter 2, “SettingUp Your Instrument” and the “Using the Autograv Screen” on page 2-11.Setting Up Survey ParametersFor field surveys, key parameters that you must set include the SurveyID andStation Designation System.3-2CG-5 Manual - part # 867700 Revision 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!