SQ250 <strong>FLK</strong> <strong>Gas</strong> <strong>Sampling</strong> <strong>System</strong><br />

• Signals to the heat exchanger unit<br />

• Before the motor protective switch in the control cabinet for the heat exchanger unit is switched on, the<br />

control signals must be checked by operating the separate contactors.<br />

• After switching in the main switch on the left side of the control cabinet and closing the protective switch, the<br />

direction of rotation of the blower and the circulation pump can be checked by momentary pressing the<br />

corresponding contactor relays.<br />

Note:<br />

See also the operating manual for the heat exchanger unit, Chapter Start-up.<br />

After termination of the signal test, the sealing check test and the flow check of the measuring gas line should take place. To<br />

do this, a method of changing certain counter values has been provided in the PLC program. See the Chapter Servicing, flow<br />

and sealing tests.<br />

3.2.2 Compressed air<br />

After the check of the compressed air hose and the retraction device with the probe installed, the compressed air can be fed<br />

with the shut-off valves closed.<br />

When using the retraction device with emergency retraction by a compressed air motor, the direction of rotation of the<br />

compressed air motor must be checked by slowly opening the main shut-off valve on the valve combination. When no<br />

voltage is applied, the traverse carriage must withdraw from the kiln. The compressed air motor is stopped in the withdrawn<br />

state by the compressed air limit switch.<br />

The compressed air connections should be tight to minimize consumption.<br />

Note:<br />

For the limit switch settings and the start-up of the traverse carriage see the operating manual for the<br />

retraction device and the valve combination.<br />

3.2.3 Purging process<br />

The purging is started by:<br />

1. The "Start" push-button on the valve combination or in the controller (when the probe is withdrawn only with the<br />

automatic switch in "Manual");<br />

2. When the probe is inserted;<br />

3. Automatically after expiry of the waiting interval between two purgings ( CTR 1 or 2 );<br />

4. The negative pressure in the measuring gas line is too high.<br />

The purging process with compressed air can be checked by pressing the "Start" button on the valve combination.<br />

Once the purging has started, the four-way ball valve is set to the "CLOSED" position. Then the release of the cleaning cycle<br />

(compressed air cleaning) occurs. When finished, the four-way ball valve moves to the position "Blow out condensate". Then<br />

the collected condensate is blown out of the condensate vessels. After this period has expired the four-way ball valve moves<br />

through the "Test" position (pressure balancing of the measuring gas line) into the "Measure" position. Then a low pressure<br />

test occurs after the measuring gas pump has started. When this has terminated, the purging process finishes after a<br />

measurement bridging period.<br />

The purging can be terminated at any time with the "Stop" buttons on the valve combination and in the controller.<br />

With the cleaning cycle, special attention must be paid to the correct sequence for controlling the compressed air valves.<br />